Similar Projects
Ferguson JROTC Building Renovation
Renovation
Bidding
$1,000,000 est. value
Jackson, MS 39212

Vancleave Restroom Renovations
Renovation
Bidding
Vancleave, MS 39565

General Construction - Long Beach School District Hurricane Repairs
Post-Bid
Long Beach, MS 39560

George County School District Hurricane Zeta Repairs
Renovation
Post-Bid
Lucedale, MS

Bailey Apac Middle School Renovations
Renovation
Results
Jackson, MS 39202

Carver Middle School Gymnasium and Classroom Addition
Addition
Results
Raymond, MS 39154

Regents School Of Oxford
New Construction
Pending Verification
Oxford, MS

Mannsdale Sixth Grade School
New Construction
Bidding
Madison, MS 39110

Renovations to Natchez High School
Renovation
Post-Bid
Natchez, MS 39120

Powell Middle School Renovation
Renovation
Results
Jackson, MS 39213

Chalybeate Auditorium and Hallways Renovation
Renovation
Bidding
MS

High School Building Improvements Phase I
Renovation
Post-Bid
Raymond, Utica, MS 39154

Brinkley Middle School Renovations
Renovation
Results
Jackson, MS 39213

East Central Restroom Renovations
Renovation
Bidding
Moss Point, MS 39562

Jefferson Davis High School Additions and Renovations
Renovation, Addition
Post-Bid
Bassfield, MS 39421

Last Updated 07/07/2021 08:35 AM
Project Title

Forest Hill High School Performance Arts Renovation

Physical Address View project details and contacts
City, State (County) Jackson, MS   (Hinds County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,400,594
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the alteration of spaces within the existing Arts and Performing Arts program of the high school. Work includes, but is not limited to, the following: 1- The existing Auditorium renovation will include: finish upgrades, seating replacements, lighting and audio/visual system upgrades, and stage equipment and rigging upgrades. 2- Ancillary spaces will also receive finish and lighting upgrades, as well as door and hardware replacement. 3- The adjacent Atrium/Lobby space will be thoroughly cleaned. New signage will be added, along with ceiling and lighting replacements in select areas. 4- In the existing Art Rooms, millwork will be replaced along with existing plumbing fixtures. Ceiling tiles and lighting will be replaced. Paint booths will be replaced. 5- The Band Hall will receive a toilet upgrade due to a lack of ADA accessible toilets. Selective floor finishes will be replaced, along with limited lighting. Exterior doors and hardware will be replaced.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment.
Division 12 - Furnishings, Countertops.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents