Similar Projects
Jenkins Road Subdivision
New Construction
Conception
Andover, MA

Jessie's Lane Subdivision
New Construction
Conception
Dennis, MA 02670

Birch Drive LIP Housing
New Construction
Design
East Pepperell, MA 01463

Whisper Ridge
New Construction - 1,452,000 SF
Design
$10,000,000 CJ est. value
Hopkinton, MA 01748

478-480 Union Street Homeownership Development
Bidding
New Bedford, MA

Bathroom Upgrades - General Bids
Renovation
Bidding
Less than $213,000 est. value
Concord, MA 01742

Residential Rehabilitation Services
Term Contract
Post-Bid
Boston, MA

Purchase and Redevelopment 427 Bay Street
Post-Bid
Less than $98,400 est. value
Springfield, MA

Affordable Housing Development
Results
Chatham, MA 02633

Housing Rehabilitation Services
Results
Less than $40,000 est. value
Edgartown, MA 02539

Tyng Village
New Construction
Construction
$4,500,000 est. value
Tyngsborough, MA

Timber Crest Estates
New Construction
Construction
$61,448,981 est. value
Medway, MA 02053

Residences at Caddie's Place an Village at Indian Pond
New Construction
Pending Verification
Kingston, MA

Bluebird Estates
New Construction
Pending Verification
Westford, MA 01886

Massasoit Estates
New Construction
Conception
Taunton, MA

Reported 12/13/2018 12:00 AM
Project Title

Fire Damage Unit Replacement at 107 B Lawn Street

Physical Address View project details and contacts
City, State (County) Boston, MA   (Suffolk County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $49,500
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Work includes a full spectrum of construction activities as follows: selective demolition, rough and finish carpentry, plumbing, electrical, floor restoration, painting, tile installation, window glazing, window sash replacement, sealants, system testing, and cleaning. The term of the contract is 90 days from Notice to Proceed.
Details
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents