Similar Projects
Taxiway U from Customs Ramp to Taxiway V (Mill and Overlay) - City of El Paso
Infrastructure
Conception
$2,500,000 CJ est. value
El Paso, TX 79925

Taxiway U from Customs Ramp to Taxiway V (Mill and Overlay) - City of El Paso
Infrastructure
Conception
$2,500,000 CJ est. value
El Paso, TX 79925

Maintenance & Operations Facility - 2017 Bond - Socorro Independent School District
New Construction, Infrastructure
Design
$10,610,000 CJ est. value
El Paso, TX 79901

Village at Westside Crossings
New Construction, Infrastructure - 136,222 SF
Design
$100,000,000 CJ est. value
El Paso, TX 79901

American Canal Lower Reach Replacement
Infrastructure
Bidding
$10,000,000 CJ est. value
El Paso, TX 79901

EPIA Terminal Ceiling and Lighting Replacement
Renovation, Infrastructure
Bidding
$7,000,000 CJ est. value
El Paso, TX 79925

Modesto Gomez Park Improvements
Infrastructure
Post-Bid
$2,977,800 CJ est. value
El Paso, TX 79905

Fort Bliss Paving IDIQ
Post-Bid
$10,000,000 to $25,000,000 est. value
Fort Bliss, TX

2021 Road and Bridge Paving Project
Results
El Paso, TX

Comprehensive Tactical Infrastructure Maintenance and Repair (CTIMR) for Big Bend Sector and El Paso Sector In Texas
Results
$750,000 est. value
El Paso, TX

CODE Apartments
New Construction, Infrastructure - 6,908 SF
Construction
$1,000,000 CJ est. value
El Paso, TX 79932

Eastlake Building #2 Shell / Eastlake Marketplace Shopping Center
New Construction, Infrastructure - 30,000 SF
Construction
$2,100,000 CJ est. value
El Paso, TX 79928

Mister Car Wash / Pellicano Drive
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
El Paso, TX 79928

Home2Suites / El Paso East
New Construction, Infrastructure - 65,386 SF
Pending Verification
$6,000,000 CJ est. value
El Paso, TX 79938

El Paso Medical Clinic
New Construction, Infrastructure - 4,700 SF
Design
$940,000 CJ est. value
El Paso, TX 79936

Last Updated 11/21/2022 09:33 AM
Project Title

Rio Vista Road and Bovee Road Bridge Replacement Project

Physical Address View project details and contacts
City, State (County) Socorro, TX 79927   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

0924-06-424, BR2021(136) The estimated project budget is in the range of $1,900,000 - $2,400,000.00. Bidders interested in Bidding on this project may contact Rossy Cardenas by email at Rossy.Cardenas@DECorp.com to receive an electronic copy of Plans and Specifications. Bidders may ask the Design Engineer questions about the project from October 24th, 2022 thru November 2nd, 2022 by 5:00 p.m. All questions will be received by email and shall be sent to Jose L. Reyes at Jose.Reyes@DECorp.com. Responses will be provided to all prospective bidders at email address provided by July 18th, 2022. Bidders on this Project do not have to be prequalified by TXDOT. Cone of Silence: Please note requirements of the City's "Cone of Silence" Policy found in section I-B, Information for Bidders, item number 24. The Cone of Silence Policy prohibits any communication except as provided in the Policy. The Cone of Silence begins on the day the bid is advertised and terminates on the day that a recommendation of contract award is placed on the City Council agenda. Please note the City's experience requirements, for award of this project, in Section I-B, Information for Bidders, Method of Award-Lowest Responsible and Responsive Bidder: Wage Rates: Where there are similar wage rate classifications in wage determinations, the higher wage shall be paid. The contractor shall pay not less than the wage rate as determined by the Secretary of Labor and State Statue, based on the controlling wage rate zone applicable of the Davis-Bacon Act, as provided on the Applicable Wage Rates, provided in Section I-F of this proposal. Bidder must provide a working e-mail address so as to receive any addenda or clarification issued by the owner. Download of plan documents will only be available up to 3 days prior to Bid Closing. Bidder will leave email to receive addenda information. You may contact Rossy Cardenas via email at Rossy.Cardenas@DECorp.com or via telephone at (915) 373-9471 for more information. Office hours are 8:00 a.m. 5:00 p.m., Monday - Friday SCOPE OF WORK The scope of work includes the following four (4) Base Bids: Base Bid 1 (Funded by TxDOT) Base Bid consists of work for removal of existing pavement with project limits and existing bridge structure at Rio Vista at Franklin Canal, including Pedestrian Bridge. Proposed Improvements included in this Base Bid includes all labor', materials and equipment for the construction of new single span bridge, concrete approach Slab, 5ft Sidewalks, driveways, ADA compliant ramps, signs and pavement marking and concrete riprap within Franklin Canal 100ft upstream and downstream of proposed bridge. Base Bid 2 (Funded by City of Socorro) Base Bid consists of all labor, equipment and materials for the placement concrete riprap within Franklin Canal beyond 100ft upstream and downstream of proposed bridge. Base Bid also includes all labor, equipment, and materials for upgrade of signals in Alameda Ave (SH 20) and all pavement marking, signs and median modification north of Alameda. Base Bid 3 (Funded by TxDOT) Base Bid consist of work for removal of existing pavement with project limits and existing bridge structure at Bovee Road at Franklin Canal. Proposed Improvements included in this Base Bid includes all labor, materials, and equipment for the construction of new single span bridge, concrete approach Slab, 5ft Sidewalks, driveways, ADA compliant ramps, signs and pavement marking and concrete riprap within Franklin Canal 100ft upstream and downstream of proposed bridge. Base Bid 4 (Funded by City of Socorro) Base Bid consists of all labor, equipment, and materials for the placement concrete riprap within Franklin Canal beyond 100ft upstream and downstream of proposed bridge. Base Bid also includes all labor, equipment, and materials for relocation of existing 8-inch waterline.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents