Similar Projects
Georgetown Municipal Water and Sewer Service - Rogers Gap Pump Station Replacement
Demolition, New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Georgetown, KY 40324

South Valeria Water Tank Line Extensions
Renovation
Bidding
$2,000,000 CJ est. value
Campton, KY 41301

Sewer Pump Station
Renovation
Post-Bid
Bowling Green, KY

Sewer Pump Station
Renovation
Post-Bid
Bowling Green, KY

Fairmount Road Pump Station Force Main Extension Phase 1
Results
$350,000 to $500,000 est. value
Louisville, KY 40291

Lafayette Drive Pump Station and Force Main Diversion
Results
$25,000 est. value
Owensboro, KY 42303

Dry Run WWTP Influent Pump Station
New Construction, Infrastructure
Bidding
$7,000,000 CJ est. value
Shelbyville, KY 40065

Sewer Pump Station Piping & Accessory Purchase
Term Contract
Post-Bid
Bowling Green, KY

5th Street Pump Station Controls
Results
Ashland, KY

Water Quality Improvements Project Contract 1 - Waterlines
Infrastructure
Bidding
$300,000 CJ est. value
West Liberty, KY 41472

Derrickson Lift Station and Force Main
New Construction, Infrastructure
Post-Bid
Morehead, KY

Turfway Pump Station Relief Sewer Phase 2
Results
Less than $1,765,000 est. value
Florence, KY

Contract 3 Campton Tank Replacement Project
Renovation, Infrastructure
Bidding
$100,000 CJ est. value
Campton, KY 41301

JC Osborne Water Booster Pump Station
Renovation
Post-Bid
Hyden, KY

Washington Street Flood Pump Station Motor Control Center Upgrades
Results
Newport, KY 41071

Last Updated 09/30/2022 06:03 PM
Project Title

County Booster Station Improvements

Physical Address View project details and contacts
City, State (County) Lewisport, KY 42351   (Hancock County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: replacement of existing suction and discharge piping, pumps, electrical wiring and controls and other appurtenances as described for a complete functional installation. The Project has an expected duration of 90 days. A pre-bid conference for the Project will not be held. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents