Similar Projects
Government Center Campus Reconstruction and Site Development
Renovation, Infrastructure
Bidding
Salt Lake City, UT 84115

Herriman Main Street Park Strip Project
Infrastructure
Bidding
Herriman, UT

Walker Lane Well Rehabilitation
Post-Bid
$385,462 est. value
Holladay, UT 84117

Grasmere Park Site Improvement Project
Infrastructure
Post-Bid
West Valley City, UT 84119

Airport Glycol Plant / Wildlife Office Space
Results
Less than $3,170,000 est. value
Salt Lake City, UT 84116

Wellhead Equipment for Forge
Term Contract
Results
Salt Lake City, UT

Paxton East Parking Lot
New Construction
Construction
$50,000 est. value
Salt Lake City, UT 84101

Sunroc Block Plant Landscaping
New Construction
Construction
Bluffdale, UT 84065

Beehive Clothing Mills Site Improvements
Alteration
Bidding
Taylorsville, UT 84123

Bio Polymers Rodi Pipe Replacement
Alteration
Post-Bid
$323,897 est. value
Salt Lake City, UT 84132

University of Utah Category 4 Inspection Drill Pipe, Hwdp, Collars, Stabilizers
Term Contract
Results
Salt Lake City, UT

Costco
New Construction
Construction
Riverton, UT 84065

Headquarters Well Evaluation & Rehabilitation
Term Contract
Post-Bid

New Cyprus High School, Earthwork
Results
Magna, UT

Hamilton Well Rehabilitation
Infrastructure
Post-Bid
Herriman, UT

Reported 04/07/2022 12:00 AM
Project Title

Monroc Well and Reservoir 4 Site Improvements Project

Physical Address View project details and contacts
City, State (County) Cottonwood Heights, UT 84121   (Salt Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Pumps and Wells, Site Development
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 03/14/22
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally includes providing all labor, materials, tools and equipment necessary to perform site improvements at the existing Monroc well and Reservoir 4 sites. The improvements at Monroc well generally include demolition of the existing concrete panel fence; earthwork; temporary fencing; landscape repair; irrigation repair; gravel landscaping; new vinyl fencing with concrete mow strip and reinforced concrete retaining mow strip; concrete retaining wall; modular concrete retaining wall; concrete mow strip; complete. The improvements at Reservoir 4 generally include the demolition of the existing asphalt, curbing etc; earthwork; fencing with concrete mow strip; reinforced concrete drive access and curb; gravel landscaping repair; asphalt pavement; storm drainage piping and boxes; installation of electrical conduit; complete, as described in the project drawings and specifications.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents