Similar Projects
Grit Removal Improvements - Rock Creek Pump Station - 302401 - City of Independence
Renovation
Conception
$750,000 CJ est. value
Independence, MO 64050

Disinfection Wastewater Treatment Plant - City of Kirksville
Renovation
Design
$1,100,000 CJ est. value
Kirksville, MO 63501

RFQ D/B - Biosolids Improvement at Regional Water Reclamation Facility
Renovation
Bidding
$300,000 CJ est. value
Jefferson City, MO 65101

Pere Cliff Plant Removal and Lift Station Improvements
Infrastructure
Bidding
$430,000 CJ est. value
Fenton, MO 63026

Warrenton WWTP Ultraviolet Disinfection System
New Construction
Post-Bid
Warrenton, MO

Wastewater Treatment Facility Improvements at Jackson County Public Works Vehicle Service Center
New Construction
Post-Bid
Grain Valley, MO

Wastewater Treatment Facility Improvements
New Construction
Results
Jonesburg, MO

Water Reclamation Center Phase 3 Expansion
New Construction
Results
Wentzville, MO

Wastewater Treatment Facility Headworks Repairs - 2022
Infrastructure
Construction
$276,467 CJ est. value
Kansas City, MO 64152

2021 Bond - City of Warrenton
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Warrenton, MO 63383

Redundant Slaking System
Renovation
Bidding
$1,000,000 CJ est. value
Sugar Creek, MO 64054

Wastewater System Improvements
Renovation
Post-Bid
$1,600,000 est. value
Greenfield, MO

Monroe City WWTP Improvements
New Construction
Results
Monroe City, MO

Chlorine Leak Scrubber System
Renovation
Bidding
$23,980 CJ est. value
Branson, MO 65616

WWTP Snail Removal Structure Renovation
Renovation
Post-Bid
$360,000 est. value
Monett, MO

Last Updated 09/15/2022 03:03 AM
Project Title

Nutrient Removal - Rock Creek Treatment Plant - 302502 - City of Independence

Physical Address View project details and contacts
City, State (County) Independence, MO 64053   (Jackson County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2027
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design and construction of a nutrient removal systems for the Rock Creek Treatment Plant. Removal will include reductions in both nitrogen and phosphorus. The Rock Creek Treatment Plant will go through its next National Pollutant Discharge Elimination (NPDES) cycle in FY 2025. Trends indicate that maximum total daily limits will be applied for nitrogen and phosphorus, thus requiring plant improvements to achieve these reduction numbers. As September 15, 2022, this project is currently in the FY 2022-2028 CIP . Funding for this project is allotted in the city's capital improvement plan for construction FY '26/'27. A firm timeline has not been established; however, construction is scheduled for Fiscal Year '26/'27. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents