Similar Projects
Structured Cabling for District 7
Alteration
Bidding
Charleston, WV 25311

Replacement of 12 Network Switches and Support for 3 Years
Term Contract, Alteration
Bidding
Charleston, WV

Wide Area Network
Post-Bid
Washington, DC

Wide Area Network
Post-Bid
Washington, DC

National Physical Security (NPSP) Maintenance and Installation
Results
Less than $29,000,000 est. value

National Physical Security (NPSP) Maintenance and Installation
Results
Less than $29,000,000 est. value

9-1-1 Radio Upgrade
Alteration
Bidding
Hinton, WV

Wide Area Network
Post-Bid
Summersville, WV

63--Photoelectric Beam Detection Monitoring & Alarm System
Results
Martinsburg, WV 25405

Security Cameras and Equipment
Alteration
Bidding
Summersville, WV 26651

Cabell County Schools Security Server and Camera Project Winter and Spring 2020-2021
Post-Bid
Huntington, WV

Design and Installation of Led Video Boards
Results
Morgantown, WV 26506

Acquire Security Equipment (Access Control)
Post-Bid
Lewisburg, WV

Provide, Install, And Maintain A Reaward Leased Tail 100Mb Ethernet Vpn Access Circut
Results
Fort Detrick, MD - Kingwood, WV

71--Installation of Conference Table for AV Equipment
Term Contract
Post-Bid
Kingwood, WV

Last Updated 12/14/2021 10:09 AM
Project Title

Surveillance and Door Access

Physical Address View project details and contacts
City, State (County) Wheeling, WV   (Ohio County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

WVNCC is seeking a vendor that can, if viable, upgrade our current systems. Integrating them together while re-using what equipment that can be reused. Saying that we believe we will be best served with an upgrade to Genetec and will be looking for bids from Unified Elite Partners with Genetec. For the sake of fairness, we will also accept bids from other companies that believe they can meet our needs with a complete rip and replace. While this option may not be cheaper than the upgrade option path. We will consider ease of use, available ability of features, and proposed installation Schedule for consideration.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents