Similar Projects
Last Updated | 03/17/2022 11:19 AM |
Project Title | Southside Interceptor CIPP Sewer Rehabilitation Phase 3 |
Physical Address | View project details and contacts |
City, State (County) | Vancouver, WA (Clark County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,744,122 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contractor shall furnish and install approximately 3009 lineal feet of 36-inch and 306 lineal feet of 33- inch Cured-In- Place Pipe (CIPP) to rehabilitate existing sanitary sewer Interceptor. The CIPP is to be designed for fully deteriorated gravity flow conditions. The work consists of furnishing all labor, equipment, materials, and incidentals required to rehabilitate the existing sewer mains with either steam cured or ultra violet (UV) cured CIPP. This Work will also include customer notification, bypass pumping, cleaning, root and sediment removal, initial Closed Circuit Television (CCTV) inspection and assessment, CIPP installation and testing, reinstatement of all laterals, testing, and final CCTV inspection. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |