Similar Projects
SR 3 Conn at CR 392 / Upper Riverdale Road
Infrastructure
Design
$1,000,000 CJ est. value
Jonesboro, GA 30236

North Main Street Commercial Building
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Jonesboro, GA 30236

Bridge Rehabilitation at Various Locations
Infrastructure
Bidding
$2,000,000 CJ est. value
Riverdale, GA 30274

2023 SPLOST Milling and Resurfacing Commission Districts 1 - 4
Infrastructure
Bidding
$2,000,000 CJ est. value
Jonesboro, GA 30236

Commercial Properties Re-Development
Infrastructure
Post-Bid
Morrow, GA 30260

Athletic Field Improvements Group A
Infrastructure
Post-Bid
$600,000 CJ est. value
Jonesboro, GA 30236

General Services Maintenance Complex Outbuilding
Infrastructure
Results
Jonesboro, GA 30238

New Gillem Public Safety Building
New Construction - 13,700 SF
Results
$5,000,000 est. value
Ellenwood, Forest Park, GA 30294

Spivey Road Mixed-Residential
New Construction, Infrastructure
Pending Verification
$140,000,000 CJ est. value
Jonesboro, GA 30236

South Main Street Multi Residential
New Construction, Infrastructure
Pending Verification
$180,000,000 CJ est. value
Jonesboro, GA 30236

SR 54 From SR 138 to Fulton County Line
Infrastructure
Design
$3,000,000 CJ est. value
Jonesboro, GA 30236

RFQ Design - Clayton County Multipurpose Operations and Maintenance Facility
New Construction, Infrastructure
Post-Bid
$15,000,000 CJ est. value
Jonesboro, GA 30236

CCWA Headquarters Site Reconfiguration
Infrastructure
Results
Morrow, GA

Total Lifestyle Change Addition
New Construction, Infrastructure - 1,800 SF
Pending Verification
$400,000 CJ est. value
Jonesboro, GA 30236

SR 85 From SR 279 / Fayette to CR 820 / Roberts Dr / Clayton
Infrastructure
Design
$30,000,000 CJ est. value
Jonesboro, GA 30238

Last Updated 01/16/2023 10:02 AM
Project Title

Construction of the Sector 2 Police Precinct Site Improvements

Physical Address View project details and contacts
City, State (County) Riverdale, GA 30274   (Clayton County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $620,662 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of the Sector 2 Police Precinct Site Improvements for Clayton County, Georgia Clayton County reserves the right to reject any and all bids/proposals and waive technicalities or informalities. Small, Local, Minority, and Women-Owned Enterprises are encouraged to respond and participate. Question Acceptance Deadline 11/23/2022 03:00 PM EST

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents