Similar Projects
Highway Improvement Project for CTH (County Trunk Highway) E
Infrastructure
Bidding
$300,000 est. value
Waupaca, WI 54981

2021 Minor Street Improvements
Post-Bid
Clintonville, WI 54929

Grove Street Reconstruction
Post-Bid
Iola, WI 54945

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Werner-Allen Rd Sanitary Sewer and Street Repaving
Results
New London, WI

Town of Saint Lawrence Road Improvements
Post-Bid
Ogdensburg, WI

STH 76 - New London, WI Central RR - CTH JJ
Results
New London, WI

Wolf River Road Improvements
Infrastructure
Post-Bid
Fremont, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Lind Center Road
Infrastructure
Post-Bid
Waupaca, WI

2021 Street and Utility Improvements
Results
Clintonville, WI 54929

Oak Street and Division Court Reconstruction
Infrastructure
Post-Bid
$200,000 est. value
Iola, WI 54945

STH 76 - New London, CTH JJ - Lily of the Valley Drive
Results
New London, WI 54942

Dey Road
Infrastructure
Post-Bid
$400,000 est. value
New London, WI 54961

Swan Road Project LRIP
Results
Manawa, WI 54949

Reported 05/18/2022 12:00 AM
Project Title

Larry Road

Physical Address View project details and contacts
City, State (County) New London, WI 54961   (Waupaca County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Larry Rd - From STH 54 Heading North to Town Line Approx. 5,000 L.F. - 2,500 Feet (18 Ft Pavement) Pulverize & Relay Base to a Width of 23 Feet 1 LS Place: Approx. 9" - 3/4 " in Low Area 690 TON Place: Approx. 3" - 3/4 " over the Entire Length 1,150 TON Regrade, Compact & Fine Grade to a 2% Slope Off Center Line HMA: Place: 3 1/2 " 3 LT & 4LT in Two Lifts 1,050 TON **Note: Tack coat Between Layers (.04 Application Rate) Place 2 Foot Shoulder 3/4 " CABC 310 TON From the height of the black top - a 2- foot-wide gravel shoulder - to be watered & compacted. At all driveways & intersections - saw cut with a butt joint to match road. ** Staking Grade, Traffic Control & Appropriate Signage Are Incidental to the Contract Each job to be completed within 30 days of start date, each project must be completed by October 31, 2022. If applicable, these projects may be subject to the provisions of 66.0901 & 779.14 of the Wisconsin Statutes and any required DNR permits. No bid shall be withdrawn after the opening of the bids, without the consent of the Owner (Town Board), for a period of sixty (60) days after the scheduled time for closing of the bids. The Owner reserves the right to reject any & all bids, to waive any informality in the bidding, & to award the contract to the Contractor who in the judgment of the Town of Mukwa Board will best serve the interests of the Town of Mukwa. Contract to be awarded at a Special Town Board Meeting to be held on Thursday, May 19, 2022 - 6:00 p.m. to be held at the Mukwa Town Hall.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents