Similar Projects
Port Wing - Superior Construction / Resurface
Infrastructure
Conception
$11,000,000 est. value
Maple, WI 54854

UW Superior - ESPC - 1 MW Solar Array - University of Wisconsin System - Administration
Infrastructure
Design
$1,651,000 est. value
Superior, WI

RFP Engineering - Nemadji Golf Course Irrigation Design Phase
Infrastructure
Bidding
$200,000 CJ est. value
Superior, WI 54880

Repaving of Superior Town Hall Parking Lot and Paving of Fire Hall Parking Lot
Infrastructure
Bidding
$400,000 CJ est. value
Superior, WI 54880

Hot Mix Asphalt - 2021
Post-Bid
Superior, WI

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Green Stormwater Infrastructure Improvements Barkers Island Marina
Results
Superior, WI 54880

Pond Maintenance
Infrastructure
Post-Bid
Superior, WI 54880

CTH N Improvement
Results
Ashland, Gordon, WI

Poly Fiber Flex Patch
Infrastructure
Post-Bid
Gordon, Minong, WI 54859

Asphalt Milling 2021
Results
Superior, WI

Scrub Seal with Fog Seal over Asphalt Road
Infrastructure
Post-Bid
Gordon, Minong, WI 54838

2021 CDBG and CIP Sidewalk Replacement
Results
Superior, WI

2022-23 Blacktop Resurfacing - Hot Mix Bond Leader Lake Road to Leader Lake Road
Infrastructure
Post-Bid
Minong, WI 54859

Last Updated 07/26/2022 12:34 PM
Project Title

Local Road Improvement Project (LRIP CHI-D)

Physical Address View project details and contacts
City, State (County) Hawthorne, WI 54873   (Douglas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Local Road Improvement Project (LRIP CHI-D) project consists of replacing six 48-iinch corrugated metal pipes with steel casing pipe on CTH D, 1 mile north of CTH B. The project Items are as follows: Sawing Asphalt, Removing small pipe culverts, 48 inch Steel Casting Pipe, Subbase 8-inch, Washed Stone 1-1/2-inch, Base Aggregate Dense, Erosion Control Items, Gardening Items, Installing (provided)Geogrid. County will close the road during construction. The contractor shall be pre-qualified and certified by the Wisconsin Department of Transportation to perform the work in this bid. The successful bidder will be required to comply with the Douglas County Responsible Bidder Ordinance #1.32. Douglas County reserves the right to reject any or all bids, waive any irregularities in bidding, and to accept the bid deemed most advantageous to the County. No bid shall be withdrawn for a period of 30 days after the scheduled opening of the bids without the consent of the Douglas County Highway Department.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents