Similar Projects
Construction of Water Plant No. 1 MCC Replacement and SCADA System
New Construction
Bidding
Houston, TX 77014

Water Treatment Services
Bidding

Water Treatment Filter Leak Repairs
Post-Bid
Commerce, TX 75428

Water Treatment Plant Chemicals
Post-Bid
Texas City, TX

Capital Improvement Program Multiple Projects
Addition
Results
Sugar Land, TX

Rehabilitation of Waste Water Treatment Plant at HC BOF
Results
Houston, TX 77045

Construction of Water Plant Expansion
Post-Bid
TX

Water Plant Disinfection Conversion to Chloramines
Results
Less than $288,986 est. value
Moulton, TX 77975

Water Plant No. 2 Expansion
Post-Bid
TX

Canal Street Water Treatment Plant Chlorine Handling Improvements
Results
$4,183,200 to $5,210,000 est. value
El Paso, TX

Repair and Replacement Services at the North Water Treatment Plant
Post-Bid
Mission, TX 78572

Water Plant Improvements - 2019
Results
$103,000 est. value
Richmond, TX 77406

Pine Lake Cove Water Plant
Post-Bid
Conroe, TX

Glendale Lakes Water Plant No. 1 Expansion No. 2
Results
Less than $1,925,000 est. value
TX

Water Plant Improvements
Post-Bid
Orchard, TX

Reported 01/29/2021 12:00 AM
Project Title

AMIS Rehab Water System

Physical Address View project details and contacts
City, State (County) San Antonio, TX   (Bexar County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $1,500,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitate deteriorated water system components at Diablo East for the Department of Interior, National Park Service, at Amistad National Recreation Area: 1. Abandonment of existing water main, service lines, and appurtenances 2. New HDPE water mains, encasement piping 3. Tracer wire and access stations 4. Gate valves, fire hydrants, water service lines, curb stops, and appurtenances 5. Reduced pressure zone valves (RPZ), Pressure reducing valves (PRV) and air release valves (ARV) 6. Fiber conduit, access boxes 7. OPTION 1 – New HDPE water pipe from well house to road 8. OPTION 2 - Manufacture and installation of a water truck fill station

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents