Similar Projects
R6 Livestock Fence Construction IDIQ
Term Contract
Design

SR 99/Lincoln Way Vic to Evergreen Way - ADA Compliance
Infrastructure
Design
$969,000 CJ est. value
Everett, WA 98208

SR 526/Airport Rd to E Casino Rd - Seismic Retrofit
Infrastructure, Renovation
Bidding
$7,000,000 CJ est. value
Everett, WA 98208

Mariner High School Renovation and Addition
Addition, Demolition, Renovation, Infrastructure
Bidding
$17,000,000 CJ est. value
Everett, WA 98204

Darrington Compound Fence Install
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Darrington, WA 98241

Darrington Compound Fence Install
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Darrington, WA 98241

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

Whitehorse Trail Improvements
Renovation, Alteration
Post-Bid
WA

Tower Site Readiness Phase III Project
Infrastructure
Results
Arlington, Bothell, Darrington, Everett, Monroe, WA 98241

Swift Brt Orange Line Construction
Infrastructure
Results
Everett, WA 98201

SR 531/43rd Ave NE to 67th Ave NE - Widening
Infrastructure
Design
$29,204,000 CJ est. value
Marysville, WA 98271

Water Pressure Reduction Project - Phase 2
Infrastructure
Bidding
$4,870,900 CJ est. value
Lynnwood, WA 98036

Skagit Wildlife Area North Leque Restoration
Infrastructure
Post-Bid
$375,000 est. value
Stanwood, WA

Fencing Services
Alteration
Results
WA

2022 - Small Works Roster
Term Contract
Design
$350,000 CJ est. value
Marysville, WA 98270

Last Updated 08/02/2022 08:05 AM
Project Title

Remove and Replace Some 4' Chain Link Fence With 8' Chain Link Fence

Physical Address View project details and contacts
City, State (County) Sultan, WA 98294   (Snohomish County)
Category(s) Education, Heavy and Highway, Single Trades
Sub-Category(s) Fencing, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $90,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Sultan School District is accepting proposals for the labor and materials by a contractor to remove sections of 4 chain link fencing, replace with 8 chain link fencing and add additional 8' sections of chain link to secure the perimeter of the Sultan High School campus.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents