Similar Projects
Crossroads Hollywood Mixed Use Development
New Construction - 1,400,000 SF
Conception
$10,000,000 CJ est. value
Los Angeles, CA 90028

Middlefield Park Masterplan
New Construction, Demolition - 1,467,000 SF
Conception
$10,000,000 CJ est. value
Mountain View, CA 94043

The Theatre House Mixed Use Development
New Construction
Design
San Diego, CA 92101

Grand Avenue Apartments
New Construction - 48,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Los Angeles, CA 90015

Victory Residences
New Construction - 1,000 SF
Post-Bid
Less than $500,000 CJ est. value
Los Angeles, CA 91401

Suite 130 Renovations - One Civic Center Drive
Renovation
Post-Bid
San Marcos, CA 92069

Maceo May Apartments
New Construction
Construction
$41,000,000 est. value
San Francisco, CA 94130

Meta Housing Corporation Affordable Housing
Construction
San Fernando, CA 91343

Broadway and 2nd Street Mixed Use Tower
New Construction - 10,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Los Angeles, CA

Harrison Gardens Mixed Use Development
New Construction - 876,940 SF
Pending Verification
$518,000,000 est. value
San Francisco, CA

Hyde Park Multifamily Development
New Construction, Demolition - 850,000 SF
Conception
Los Angeles, CA 90043

Angels Landing Mixed Use Master Plan
New Construction
Design
$2,000,000,000 est. value
Los Angeles, CA 90013

Sonora Square Apartments General Building Contractor
New Construction
Post-Bid
Stockton, CA

UC Hastings College of Law Campus Housing
New Construction - 356,000 SF
Construction
$40,000,000 est. value
San Francisco, CA 94102

Acme Family Apartments
New Construction
Pending Verification
Santa Rosa, CA 95407

Last Updated 11/03/2021 04:30 PM
Project Title

Water Street Housing Development

Physical Address View project details and contacts
City, State (County) Santa Cruz, CA 95060   (Santa Cruz County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Bids by Invitation.
Project Status Design Development, Construction Start Expected fourth quarter 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Apartments/Condominiums, to 5 Stories Above Grade, 90,285 SF New Construction, 145 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents