Similar Projects
2021 Sewer Line Rehabilitation Project
Bidding
Clifton, CO 81520

2021 Preventative and Critical Lining
Bidding
$3,600,000 to $4,000,000 est. value
Denver, CO

Denver Coliseum Storm Drain Repair
Post-Bid
Denver, CO 80202

Cherry Creek Interceptor Project
Post-Bid
Parker, CO

Storm Drainage Rehabilitation and Improvements
Results
Longmont, CO 80501

South Englewood Storm Sewer Maintenance
Results
Englewood, CO 80110

Cherry Creek Interceptor Project - Trenchless Construction Portion
Post-Bid
Parker, CO

2019 Ridge Road Storm Sewer Project
Results
Less than $248,850 est. value
Littleton, CO 80120

CR Water Projects Request for Pre-qualifications
Post-Bid
Castle Rock, CO 80104

2020 Townwide Storm Pipe Camera and Vacuum Cleaning
Results
$30,000 to $50,000 est. value
Parker, CO

Sterling Ranch Middle Fork Street
New Construction
Post-Bid
Highlands Ranch, CO

Tollgate and Sand Creek Interceptor Diversion Structures Rehabilitation Phase 2
Results
$3,210,000 to $3,370,500 est. value
Aurora, CO 80012

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

Pipe Lining Projects
Results
Colorado Springs, CO 80903

Stormwater Facility Maintenance
Post-Bid
Canon City, CO

Last Updated 06/23/2020 02:29 PM
Project Title

2020 Cherrymoor South Interceptor Rehabilitation

Physical Address View project details and contacts
City, State (County) Cherry Hills Village, CO 80113   (Arapahoe County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish, install, test and provide a completed UV Cured CIPP rehabilitation, as well as repair and replace where indicated on construction documents. The project boundaries start at the intersection of East Quincy Avenue and South High Street and proceed approximately 5200 feet south and east until the boundary of the Cherry Hills Village Service Area North of Belleview Avenue (As Depicted in the Construction Documents). Work also includes the installation of 3 new manholes on the existing sewer interceptor. The interceptor is mostly 8-in diameter and 10-in Vitrified Clay Pipe (VCP) and is approximately 30 - 40 years old. It has experienced severe corrosion and deterioration. The UV Cured CIPP shall be designed with the liner being able to withstand all external loads including live loads, soil loads and hydrostatic (groundwater) pressure, which is assumed to be 1-ft below the ground surface to the invert of the existing pipe for each specific installation location.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents