Similar Projects
On-Call Task Order General Construction Services FY 19/20
Term Contract
Post-Bid
Salt Lake City, UT

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

18K: Printers Row Waterline Replacement
Results
West Valley City, UT

2019 State Street Waterline Replacement
Results
Less than $1,200,000 est. value
Murray, UT 84107

19D: Large Meter Replacement Project
Post-Bid
West Valley City, UT

MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Results
Less than $3,293,600 est. value
Salt Lake City, UT 84115

Mountain Dell Outlet Rehabilitation - Control Valves Pre-Purchase
Post-Bid
Salt Lake City, UT 84115

500 South Surplus Siphon Vault Replacement
Results
Less than $244,438 est. value
Salt Lake City, UT 84104

Conductor Pipe for Stratigraphic Well
Post-Bid
Salt Lake City, UT

Scenic Drive Upper Conduit Slipline Project
Results
Less than $695,500 est. value
Salt Lake City, UT 84104

4100 South Secondary Waterline Project
Post-Bid
Magna, UT 84044

Arnold Springs Improvements Project
Results
Less than $256,561 est. value
Herriman, UT 84096

Little Cottonwood Penstock Lining Repair
Post-Bid
Murray, UT 84107

Chavez Drive Pipe Lining Project
Results
$30,000 to $40,000 est. value
South Jordan, UT 84095

Secondary Water Meter Installation
Post-Bid
South Jordan, UT 84095

Last Updated 01/29/2020 04:07 PM
Project Title

State Street Waterline Replacment

Physical Address View project details and contacts
City, State (County) Murray, UT 84107   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of this Contract comprises the construction of approximately 4,000 feet of 8-inch diameter pipe, 1,100 ft of 10-inch pipe, and 2,300 ft of 12-inch pipe along State Street (US89), between 4500 South (SR266) and 5300 South (SR173). The project will include a mix of removing and replacing existing waterlines and installing parallel waterlines while abandoning existing mains in place. All work will be performed in accordance with construction phasing developed by the contractor and approved by the Owner. That phasing plan must include a means to provide temporary water service to customers during construction of the waterline. The project site is located along State Street, between 4500 South and 5300 Southin Murray City, Utah.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents