Similar Projects
Y--GAOA - EMDD Fog Seal
Term Contract
Design
$100,000 to $250,000 est. value
Billings, MT 59101

Spokane Avenue Watermain Replacement Project
Term Contract
Bidding
Whitefish, MT 59937

Mercury Street Improvements Project
Infrastructure
Post-Bid
Butte, MT 59701

Removal and Replacement of Road and Parking AC Pavement in Riverfront Park
Infrastructure
Post-Bid
Billings, MT

24th Street West Central Avenue Signal, Turn Lane, and Pedestrian Improvements
Infrastructure
Results
Billings, MT 59102

Anaconda Stack State Park Parking Lot Improvements
Infrastructure
Results
$125,000 est. value
Anaconda, MT 59711

Phase 1 Distribution System Improvements
Alteration
Post-Bid
Big Timber, MT

City ADA Project
Infrastructure
Results
Billings, MT 59102

Replace 2 Structures, Grading, Gravel, Pms Overlay, Sidewalk, Curb/Gutter And Guardrail On The Beaver Creek-Wibaux 1 Mile s Wibaux Project Located In Wibaux County
Infrastructure
Post-Bid
MT

Jaycee Park Sidewalk and Shelter Project
Renovation, Infrastructure
Results
Dillon, MT

Lone Peak High School - Phase 2 Addition And Renovation - Bid Package #2
Renovation, Term Contract, Infrastructure, Alteration
Post-Bid
Gallatin Gateway, MT

Ada Ramps Program FY 2022
Alteration
Post-Bid
Helena, MT

Small Concrete Project
Alteration
Post-Bid
Billings, MT

Optimist Park Site Improvements
Infrastructure
Post-Bid
Billings, MT 59101

Central Park Tennis Courts Replacement
Demolition, Alteration
Post-Bid
Billings, MT

Reported 03/25/2022 12:00 AM
Project Title

Sidewalk and Curbing

Physical Address View project details and contacts
City, State (County) Kalispell, MT   (Flathead County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 03/06/22
Owner View project details and contacts
Architect View project details and contacts
Description

The contract primarily consists of replacing existing damaged concrete sidewalk, curbing, gutters, driveway approaches and restorative landscaping. Projects are located throughout the incorporated limits of the City of Kalispell and work is completed on an as needed basis with the issuance of work orders. Portions of the work to be completed will be within the City’s 50/50 Sidewalk Replacement Program in which residents and the City partner to replace damaged sidewalks.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents