Similar Projects
West Henderson Parks And Recreation, Phases 2 - 5 - PR247 - City Of Henderson
New Construction, Infrastructure
Conception
$84,000,000 CJ est. value
Henderson, NV 89015

Burkholder Blvd - Warm Springs To Russell, Phase 2 - ST093 - City Of Henderson
Infrastructure
Conception
$6,600,000 CJ est. value
Henderson, NV 89015

Tropicana Grand Canyon Apartments
New Construction - 682 SF
Design
Las Vegas, NV 89147

Ashley Furniture Industrial Facility
New Construction, Infrastructure - 298,389 SF
Design
$32,000,000 CJ est. value
Las Vegas, NV 89148

Clean Drop Inlets and Culverts
Infrastructure
Bidding
$4,600,000 CJ est. value
Las Vegas, NV 89106

AutoZone #6871 / Henderson
New Construction, Infrastructure - 7,380 SF
Post-Bid
$1,500,000 CJ est. value
Henderson, NV 89015

The Goddard School
New Construction - 11,006 SF
Post-Bid
$2,000,000 est. value
Las Vegas, NV 89131

SE Career and Technical Academy (SECTA) Phase III Gymnasium
New Construction - 61,333 SF
Results
$23,753,080 est. value
NV

Replacement Ruby Thomas Elementary School
Renovation - 99,866 SF
Results
$31,110,000 est. value
Las Vegas, NV 89169

Touro University Parking Expansion Phase II
New Construction
Construction
Henderson, NV 89014

Inspirada Marketplace
New Construction - 39,460 SF
Construction
$10,000,000 est. value
Henderson, NV 89009

Boulder Lodge Expansion
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$9,600,000 CJ est. value
Henderson, NV 89015

Dream Hotel Las Vegas
New Construction, Infrastructure - 27,000 SF
Pending Verification
$545,000,000 CJ est. value
Las Vegas, NV 89119

Charleston to Cheyenne Wideninig - Clark County
Infrastructure
Conception
$25,000,000 CJ est. value
Las Vegas, NV 89101

Aspire at Sunset
New Construction, Infrastructure
Design
$75,000,000 CJ est. value
Henderson, NV 89014

Last Updated 05/24/2023 06:06 PM
Project Title

Install Two New Bus Charging Stations Richard C. White Transportation Center

Physical Address View project details and contacts
City, State (County) Las Vegas, NV 89103   (Clark County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $248,527 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 24 the project is set to be awarded on July 13, Council Meeting . The work consists of installing two new electric bus charging stations. Installation of new conductors, breakers, disconnects, conduits and metal pipe bollards. Modification to existing electrical gear and all required saw cutting and asphalt/concrete patching. Prequalified Bidders shall have a Nevada Contractor's License with the Classification of B2, B, C2.The Owner's representative is: Kevin Gouveia, Project Manager, and may be reached at (702) 799-8710 x 5214 The A/E representative is: Karl Pils, and may be reached at (702) 685-0136. Bid documents will be available online via our cloud-based site "Bluebeam" beginning Tuesday, April 11, 2023. Pre-Qualified Prime Bidders will need to email Reagan Cole at colerc@nv.ccsd.net to request the invitation for the digital bid documents through CCSD's Bluebeam document viewer tool with instructions on how to view and print the Bid documents.Bidders must provide their most current letter of prequalification issued by the Clark County School District and all information listed in Part 5 of Document 00 21 13 Instructions to Bidders. The Clark County School District is an equal opportunity employer and will not knowingly discriminate in any area of employment, and invites all businesses including women-owned, minority-owned, and disadvantaged business enterprise companies to participate in our bidding process.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents