Similar Projects
Transformer - Utilities and Energy
Post-Bid
Auburn, AL

Generator Maintenance
Term Contract
Post-Bid
Huntsville, AL 35801

Z--Replace/Upgrade Electrical Switchgear Phase 3
Results
$1,000,000 to $5,000,000 est. value
Birmingham, AL 35233

One (1) 115 Kv Circuit Switchers at the Silverhill Substation
Results
Foley, AL

Lighting of Exit 46
Post-Bid
Less than $280,000 est. value
Carbon Hill, AL

Switchgear at Jones Bluff Powerhouse
Results
Selma, AL 36701

Freedom Manor Solar Project
Post-Bid
Birmingham, AL 35203

Theater Lighting
Results
Less than $19,616 est. value
Huntsville, AL

Lighting Improvements at the Capitol Complex
Post-Bid
$500,000 to $700,000 est. value
Montgomery, AL 36104

Electrical Improvements at The Champions Monument
Results
Gadsden, AL

Henry Peters Electric Service
Post-Bid
$200,000 to $225,000 est. value
Birmingham, AL

Sports Light Fixtures
Term Contract
Results
Mobile, AL 36618

LED Relamping
Post-Bid
Tuscaloosa, AL 35403

A New Emergency Generator for Utility Collections Office
Results
Dothan, AL 36303

Switchgears - Utilities and Energy
Post-Bid
Auburn, AL 368495101

Last Updated 01/09/2020 03:51 PM
Project Title

J--Electrical Voltage Testing

Physical Address View project details and contacts
City, State (County) Tuskegee, AL 36083   (Macon County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Statement of Work (SOW) describes the requirements for the maintenance, inspection, testing, and/or calibration of the Electrical Power Distribution System and all its components for the Montgomery and Tuskegee Campuses. These work items are referenced as “Maintenance and Testing” in this document, hereafter this SOW describes the requirements to establish maintenance and testing reports: a. Service to provide three-year electrical testing of high voltage, medium voltage and low voltage system panel, breakers, disconnects and all items as listed below. Electrical distribution system is located at the Central Alabama Veterans Health Center System (CAVHCS), 215 Perry Hill Road, Montgomery, Al. 36109 3798. Work is to be performed between April -June 2019 time frame after normal working hours. b. Supplies and services: Professional testing and maintenance of electrical systems and equipment. Furnish all labor, equipment and supplies necessary to provide electrical analysis to include specialized testing, inspecting, cleaning, adjusting and appraising of electrical distribution system and apparatus to assure their reliable operation. Testing shall be performed in compliance with manufacturer’s recommendations and applicable NEMA, NEC, ANSI, ASTM, ASA, and VA standards. c. Scope should include professional testing and maintenance of the following electrical systems and equipment: Switch gear equipment, medium voltage circuit breakers, load test high voltage equipment, infrared panels, eleven (11) 13K pad mount switches, eleven 13 K pad mount transformers and manholes, load study, protective relays primary disconnects, transformers, low voltage circuits breakers and generators, thirteen (13) transfer switches, two (2) double ended switchboards, one (1) generator switchboard, forty two (42) main distribution panels, two hundred and ten (210) secondary distribution panels, and five (5) manholes. One (1) 13 K double ended switchboard, with eight (8) 1200 amp. breakers.

Details

Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents