Similar Projects
ISD Acquisitions and Improvements
Renovation - 75,071 SF
Bidding
$37,943,000 est. value
San Bernardino, CA 92408

Suite 100 Remodel
Renovation
Bidding
$700,000 est. value
Colton, CA 92324

Chaffey High School South Hall Modernization Rebid BC06 Glazing
Renovation
Post-Bid
$20,000,000 est. value
Ontario, CA 91762

Modular Classroom Restroom Addition At Haynes Elementary School
Renovation
Post-Bid
Ontario, CA 91762

Portable Additions to the Los Amigos Elementary School
Addition
Results
Rancho Cucamonga, CA 91701

District Wide HVAC Replacements 11 Campuses (COVID) - General Construction
Renovation
Results
$250,000 est. value
Hesperia, CA 92344

Chino HS Reconstruction Phase II
Renovation
Construction
Chino, CA 91710

Kitchen Modernization at Cypress Elementary School
Renovation - 6,500 SF
Bidding
$1,150,000 est. value
Fontana, CA 92335

Portable Classroom Building
New Construction
Post-Bid
Hesperia, CA 92345

ADA Front Entry Upgrades at Myers Elementary School
Renovation, Infrastructure
Results
Rialto, CA 92410

Los Osos HS Interim Portable Housing
Renovation
Post-Bid
$500,000 est. value
Rancho Cucamonga, CA 91701

Rancho Cucamonga High School 2 Story Classroom Building V
New Construction
Results
$5,575,000 est. value
Rancho Cucamonga, CA 91701

2 Story Classroom Building P
New Construction - 28,500 SF
Post-Bid
$8,000,000 est. value
Rancho Cucamonga, CA 91701

Playground Site Work at Riverside Preparatory Elementary School
New Construction
Results
$1,200,000 est. value
Oro Grande, CA 92368

Pre-Construction and Lease-Leaseback Services for Sierra Lakes Elementary School New Classroom Building and Kindergarten Renovation
New Construction
Post-Bid
$8,000,000 est. value
Fontana, CA 92336

Last Updated 07/20/2022 12:54 AM
Project Title

Classroom Preparation for Viewsonics (Group 4)

Physical Address View project details and contacts
City, State (County) Chino, CA   (San Bernardino County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $278,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a mixed-use development in Chino, California. Completed plans call for the renovation of a educational facility. For Classroom Preparation for Viewsonics (Group 4) The Contract Time is 90 calendar days. CONTRACTOR should consult the General Conditions, Supplementary Conditions, and General Requirements regarding Milestones and Liquidated Damages. Each bidder shall be a licensed contractor pursuant to the California Business and Professions Code and be licensed to perform the work called for in the Contract Documents. The successful bidder must possess a valid and active Class A or B License at the time of bid and throughout the duration of this Contract. The Contractors California State License number shall be clearly stated on the bidders proposal Subcontractors shall be licensed pursuant to California law for the trades necessary to perform the Work called for in the Contract Documents. Each bid must strictly conform with and be responsive to the Contract Documents as defined in the General Conditions. In accordance with California Public Contract Code Section 22300, the Owner will permit the substitution of securities for any moneys withheld by the Owner to ensure performance under the Contract. Separate payment and performance bonds, each in an amount equal to 100% of the total Contract amount issued by a California admitted surety as defined in California Code of Civil Procedure Section 995.120, are required, and shall be provided to the Owner prior to execution of the Contract and shall be in the form set forth in the Contract Documents

Details

Elementary School, Renovation, Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents