Similar Projects
Glenwood Street SW Waterline Replacement Phase II Project
Infrastructure
Bidding
North Canton, OH 44720

Bicentennial Park Leak Detection
Post-Bid
Less than $10,000 est. value
Columbus, OH 43205

Alternative Liner Pipe Material (CIPP)
Term Contract
Post-Bid

Glyco II Forcemain Replacement - Contract A
Results
$1,639,924 est. value
Painesville, OH

Ductile Iron and Pipe Fittings Price Agreement
Term Contract
Results
Kettering, OH

Stainless Steel Tapping Sleeves - MJ Gate Butterfly
Term Contract
Post-Bid
Akron, OH 44308

Wilderness Way Water Main Replacement
Results
Less than $126,600 est. value
Dayton, OH 45422

Sheldon Water Main Replacement
Post-Bid
$1,004,792 est. value
OH

Franklin Avenue I Clay Street Water Main Replacement
Results
Less than $967,257 est. value
Sidney, OH 45365

Water System Improvements Phase II
Infrastructure
Post-Bid
$549,000 est. value
Windham, OH

CR 15 Railroad Spur Waterline Lowering
Results
Less than $140,000 est. value
Newcomerstown, OH

Water Line
Infrastructure
Post-Bid
South Point, OH 45680

Mundale Avenue and Fauver Avenue Water Main Improvements
Results
Dayton, OH 45390

Howden Bufalo Waterline Relocation Project
Infrastructure
Post-Bid
$381,050 est. value
New Philadelphia, OH

West River Road Watermain Improvements Project
Results
Elyria, OH 44035

Reported 11/19/2021 12:00 AM
Project Title

WPAFB B71D Replace Cooled Waterlines

Physical Address View project details and contacts
City, State (County) OH   (Greene County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Proposed project is to replace deteriorated steel process cooling water pipe system (facilities 71A, 71D, 20, and 20A) and served by cooling towers at facility 21624 (building 71D) with new steel and fiberglass reinforced pipe (FRP) piping. FRP piping shall be for direct bury applications and areas exposed to harsh environments, i.e. existing steam tunnels. Steel piping is preferred in all mechanical room spaces and where maintenance is easily accessed. Replacement of pumps, new Process Automation System controls which includes new control valves, new VFDs, process automation system programming, new Motor Control Center MCC-71D and associated Automatic Transfer Switch (ATS), conduit and miscellaneous control components.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents