Similar Projects
Standby and Emergency Generator Maintenance and Repair
Term Contract
Post-Bid
Richmond, VA 23222

Upgrades to Emergency Electrical System for Morningside Manor, AMP 208
Post-Bid
Roanoke, VA 24017

Led Lighting Phase II
Results
$168,008 est. value
Manassas, VA

Alexandria Train Yard ATC System Replacement
Results
$26,215,000 est. value
Alexandria, VA

P-1049, Design-Build, Wallops Island Power Quality Upgrade at JEBLCFS Wallops Island, VA
Post-Bid
$10,000,000 to $25,000,000 est. value
Wallops Island, VA

Annual DPU Electric Utility Line Work
Term Contract
Results
$1,000,000 to $1,500,000 est. value
Richmond, VA 23219

Fire Station 2 Pole Mounted Signal Cabinet
Post-Bid
Chesterfield, VA 23832

Electrical Repair and Installation Services
Results
Richmond, VA 23298

New Building Diesel Generator Fill-Up
Post-Bid
Roanoke, VA 24011

Conmy Hall Lighting and Audio Upgrade
Results
Arlington, VA 22211

Electrical Maintenance Support Services
Term Contract
Post-Bid
Chesapeake, VA 23322

Field Lighting at Rockingham Park at the Crossroads
Results
Penn Laird, VA

Repairs, Rewinding, and Replacement of Electric Motor
Term Contract
Post-Bid
Alexandria, VA

Installation of Light Poles (Furnished)
Results
Richmond, VA

Meadowlark's Winter Walk of Lights Installation and Takedown
Term Contract
Post-Bid
Vienna, VA 22182

Reported 12/02/2020 12:00 AM
Project Title

Unit 1 and 2 Turbine/Generator Rehab at Philpott Powerhouse in Basset, VA

Physical Address View project details and contacts
City, State (County) Bassett, VA 24055   (Henry County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall be responsible for field verifying existing drawings and creating as-built drawings. The contractor shall furnish all labor, material, and equipment to perform this work in strict accordance with the detailed requirements of the Scope of Work (SOW) specifications and associated drawings. The work described within these specifications shall include, but not necessarily be limited to the following: Perform all work required to comply with the site operations, environmental protection, and safety and health provisions. Perform all work required for painting including lead-based paint removal and disposal. Perform all work required for miscellaneous welding, machinist, electrician, and other skilled craftsman hire. Replace draft tube man door. Replace mounts for turbine maintenance platform (TMP). Design, manufacture, prepare, and load for shipment, deliver f.o.b. destination, and unload the Francis turbine runner and appurtenances. The runner design will using computer aided turbine design and numerical flow simulation methods, and evaluation techniques. Design, manufacture, prepare, and load for shipment, deliver f.o.b. destination, and unload the wicket gates. The wicket gate design will using computer aided turbine design and numerical flow simulation methods, and evaluation techniques. Disassemble generating unit by removing rotating and stationary components and related ancillary systems. Perform alignment investigations and provide recommendations. Analyze and provide recommendation on the wicket gate mechanism component and shear linkage design. Inspect and refurbish, or replace miscellaneous turbine and generator mechanical components and piping including but not limited to: brake cylinders, brake rings (option), wicket gate shear linkages, runner wearing rings, turbine shaft packing box and gland, wicket gate packing boxes and glands, servomotor, seals, runner coupling bolts, and other components as specified. Disassemble, inspect, and refurbish the gate shaft and operating ring. Replace all greased bushings with self-lubricating and rehabilitate or replace all mating journals and running surfaces to stainless steel. Work shall include line boring of the bottom ring and head cover bushing housings and bushings. Remove grease lines, plug holes, and equipment. All grease lines and equipment will remain property of the Government. Perform draft tube liner inspection and repair. Replace generator air coolers and size appropriately to the uprated generator. Inspect turbine and generator guide bearings and generator thrust bearings with option for refurbishment. Inspect thrust bearings with option for refurbishment. Supply and install RTDs for each bearing shoe for the Thrust and Generator Guide Bearings. Replace cooling and packing water piping 1 ½" and smaller (steel) or 3" and smaller (copper). Remove existing generator fire protection system (high pressure CO2) and replace with new low pressure CO2 system. Reassemble generating unit with a new turbine runner and appurtenances and other rehabilitated and replacement components. Clean turbine pit, generator, and work and storage areas used by the Contractor. Dispose of (recycle) grease, etc. Perform complete alignment of the turbine/generator unit. Perform pre and post operational tests on the generating unit. Design, manufacture, and perform voltage endurance testing on four (4) total prototype coils (only required for first unit). Design, manufacture, shop test, prepare and load for shipment, deliver f.o.b. destination, and unload one complete set of stator coils and all accessories specified herein. Furnish new stator core. Replace the rotor field poles. Replace the existing pole bodies, remove the existing field coil insulation, reinsulate the existing field coils, assemble the reinsulated field coils with the new pole bodies, install new amortisseur winding, and reinstall pole assemblies on the rotor. Replace the field lead bus stand-off insulators from the slip ring to the field winding. Inspect and test the rotor. Install and test new stator winding and accessories specified herein. Remove existing and install new stator cores. Rewind rotating exciter armature. Reinsulate rotating exciter field winding. Refurbishment of collector rings and replacement of brushes, and brush holders. Supply spare parts. Perform generator special field tests. Perform start-up, commissioning, and testing of the generator. Perform electrical equipment/wiring removal and installation including replacement of cable, wiring, gauges/meters, miscellaneous relays, and RTDs within the air housing, turbine pit, and associated with all bearings as required and directed. Have asbestos abatement performed as required for disassembly of the units.

Details

Division 02 - Existing Conditions, Hazardous Material Assessment, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents