Similar Projects
Walmart #2889-239 Remodel / Clinton
Addition, Infrastructure - 7,278 SF
Bidding
$2,000,000 CJ est. value
Clinton, IA 52732

Concrete and Site Work for New Playground at Whittier Elementary
Infrastructure
Bidding
$50,000 CJ est. value
Clinton, IA 52732

Structures Demolition Phase I
Infrastructure
Post-Bid
Clinton, IA 52732

Asphalt Alleys & Dead-End Street Resurfacing
Infrastructure
Post-Bid
$400,000 CJ est. value
Clinton, IA 52732

Camanche High School Phase III
Renovation, Addition
Results
$9,000,000 est. value
Camanche, IA 52730

Clinton CSD Yourd Renovation Clinton High School
Renovation
Results
Clinton, IA

Poured-In-Place Rubber Surface for New Playground at Whittier Elementary
Infrastructure
Bidding
$50,000 CJ est. value
Clinton, IA 52732

Riverview Skate Park Improvements Project: Specialty Work
Infrastructure
Post-Bid
$522,024 CJ est. value
Clinton, IA 52732

Construction of a Heated Equipment Storage Facility
New Construction, Infrastructure
Results
$350,000 CJ est. value
Elwood, IA 52254

Asphalt Overlay
Infrastructure
Bidding
$920,940 CJ est. value
Clinton, IA 52732

Riverview Skate Park Improvements Project: Non-Specialty Work
Infrastructure
Post-Bid
$300,000 CJ est. value
Clinton, IA 52732

Career Technical Education Building - Bid Package 6
Infrastructure, Alteration
Results
$200,000 est. value
Clinton, IA 52732

HMA Resurfacing / Heater Scarification
Infrastructure
Bidding
$1,500,000 CJ est. value
Calamus, IA 52729

Public Works Office Building Addition
Addition, Demolition, Infrastructure - 1,600 SF
Post-Bid
$785,735 CJ est. value
Clinton, IA 52732

S. 54th Street from US Hwy 30 to 44th Avenue S. and 36th Avenue S. Improvements
Infrastructure
Results
$4,747,210 CJ est. value
Clinton, IA 52732

Last Updated 02/28/2023 03:54 PM
Project Title

Phase 3 - Addition & Renovation Camanche High School

Physical Address View project details and contacts
City, State (County) Camanche, IA 52730   (Clinton County)
Category(s) Commercial, Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Food/Beverage Service, Middle/Senior High School, Site Development, Theaters/Auditoriums
Contracting Method Competitive Bids
Project Status Construction start expected May 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $11,753,037 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Offers shall be on a stipulated sum basis for the following Bid Packages: Bid Package 3A - Concrete & Earthwork - Low Bidder - Portzen Construction $1,037,000 Bid Package 3B - Precast Concrete - Low Bidde - Mid-States Concrete Industries $510,521 Bid Package 3C - Masonry - Low Bidder - Seedorff Masonry $1,511,494 Bid Package 3D - Structural Steel & Steel Erection - Low Bidder - Tri-City Ironworks $835,750 Bid Package 3E - General Trades - Low Bidder - Swanson Construction $1,725,000 Bid Package 3F - Roofing & Sheetmetal - Low Bidder - Economy Roofing & Sheetmetal $642,950 Bid Package 3G - Drywall & Acoustical - Low Bidder - Builders Sales & Service $856,710 Bid Package 3H - Painting - Low Bidder - WF Scott Decorating $117,950 Bid Package 3I - Glazing - Low Bidder - East Moline Glass $177,330 Bid Package 3J - Food Service Equipment - Low Bidder - Rapids Foodservice Contract & Design $120,237 Bid Package 3K - Fire Protection - Low Bidder - Continental Fire Sprinkler Company $149,280 Bid Package 3L - Mechanical - Low Bidder - Regan Mechanical $1,998,853 Bid Package 3M - Electrical - Low Bidder - Rock River Electric $1,812,218 Bid Package 3N - Auditorium Seating - Low Bidder - H21 Group $122,762 Bid Package 3O - Gymnasium Equipment & Athletic Flooring - Low Bidder - Phillips Floors, Inc. $134,382 This Specification and the associated drawings govern the furnishing, installing, testing and placing into satisfactory operation the Mechanical Systems. Each Contractor shall provide all new materials indicated on the drawings and/or in these specifications, and all items required to make the portion of the Mechanical Work a finished and working system. All work will be awarded under a single General Contract. All work that will produce excessive noise or interference with normal building operations, as determined by the Owner, shall be scheduled with the Owner. It may be necessary to schedule such work during unoccupied hours. The Owner reserves the right to determine when restricted construction hours will be required. Itemize all work and list associated hours and pay scale for each item. Bid Result BP 3A - Concrete and Earthwork - Portzen Construction - $1,037,000 BP 3B - Precast Concrete - Mid-States Concrete Industries - $510,521 BP 3C - Masonry - Seedorff Masonry - $1,511,494 BP 3D - Structural Steel & Steel Erection - Tri-City Ironworks - $835,750 BP 3E - General Trades - Swanson Construction - $1,725,000 BP 3F - Roofing & Sheetmetal - Ecomony Roofing & Insulating Co. - $642,950 BP 3G - Drywall & Acoustical - Builders Sales & Service - $856,710 BP 3H - Painting - WF Scott Decorating - $117,950 BP 3I - Glazing - East Moline Glass - $177,330 BP 3J - Food Service Equipment - Rapids Foodservice Contract & Design - $120,237 BP 3K - Fire Protection - Continental Fire Sprinkler Company - $149,280 BP 3L - Mechanical - Ragan Mechanical - $1,998,853 BP 3M - Electrical - Rock River Electric - $1,812,818 BP 3N - Auditorium Seating - H2I Group - $122,762 BP 3O - Athletic Flooring - Phillips Floors, Inc. - $134,382 As of December 6, 2021, project is not rebidding at this time

Details

Renovation, Renovation.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Projection Screens, Projectors, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Furniture, Multiple Seating, Fixed Audience Seating, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Sound, Vibration, and Seismic Control.
Division 21 - Fire Suppression, Fire Suppression Systems Insulation, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Theatrical Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents