Reported | 05/27/2022 12:00 AM |
Project Title | Main Street Pump Station Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Cartersville, GA 30121 (Bartow County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Renovation of a water / sewer project in Cartersville, Georgia. Completed plans call for the renovation of a water / sewer project. The work to be performed shall consist of furnishing all materials, tools, and equipment and performing all labor necessary for constructing water system improvements as set forth in the Bid, as shown on the Drawings, and as Specified. The work generally consists of replacing pumps, foundation slab, and piping inside the existing pump station building, and yard piping connections to the existing water system within the pump station site and GA Power Right-of-way. The work also includes installing all-new electrical gear, VFDs, and installing a new 450 kW Diesel Generator. Bids shall contain prices, in words and figures, for the work bid on. All bids shall be submitted on the bid form included in the Contract documents. All bids must be accompanied by a certified check, or a bid bond of a reputable bonding company authorized to do business in the State of Georgia, in an amount equal to at least ten percent (10%) of the total amount of the bid. The bid bond shall be prepared on the form of the bid bond attached to the Contract Documents or a surety company's standard bid bond, duly executed by the Bidder as principal and having as surety thereon a surety company licensed to do business in the State of Georgia and listed in the latest issue of the United States Treasury Circular 570. Upon the proper execution of the agreement and required bonds, the checks or bid bonds of all bidders will be returned to them. All bidders must be licensed contractors as required by Georgia Law Code 43-14-8.2, State of Georgia. The utility contractor license number shall be written on the face of the bid envelope; otherwise, the bid shall not be opened. If two envelopes are used, this information must also appear on the outer envelope. A contract performance bond and payment bond, each in an amount equal to one hundred percent (100%) of the agreement amount, will be required of the successful bidder. Only general contractors that have been previously pre-qualified for this specific project may submit a bid. No submitted bid may be withdrawn for a period of sixty (60) days after the scheduled closing time for the receipt of bids. The Owner reserves the right to accept or reject any or all Bids and to waive informalities. fully complete all work hereunder within 365 calendar days |
||||||||||||||||||
Details | Lift and Pump Stations, Renovation.
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |