Similar Projects
J--Cooler Tower Repair
Post-Bid
Houston, TX 77030

J--Centrifugal and Air-Cooled Chiller Systems Annual Maintenance/ Inspection
Post-Bid
Houston, TX

Steam Utility Replacement and Temporary Boiler at the Central Plant
Results
TX

MSE Nexus Valve Replacement
Results
Houston, TX 77054

N--580-19-1-5063-0211 - Compressors - 36C256-19-Ap-0875
Post-Bid
Houston, TX 77030

Boiler Replacement at Annex 40
Results
$300,000 to $800,000 est. value
Houston, TX 77002

J--Chiller Boiler Systems Repairs MEDVAMC
Post-Bid
Houston, TX 77030

J--FY 19 Generators Preventive Maintenance & Testing
Results
Houston, TX 77030

J--Boiler Maintenance
Post-Bid
Houston, TX 770304298

Multi-Campus Mechanical Renovations
Results
Less than $2,219,400 est. value
Humble, TX 77338

Elevator Maintenance and Repair Services
Post-Bid
Houston, Pearland, TX

Hot Water Heaters
Results
Humble, TX 77396

Repair Japhet Wash Bay
Post-Bid
Houston, TX 77251

Replacement of the Underground Steam Line at the Central Plant
Term Contract
Results
Houston, TX 77002

2020 Multi-Campus Mechanical Renovations
Post-Bid
Less than $12,500,000 est. value
Humble, TX 77338

Reported 06/13/2019 12:00 AM
Project Title

J--Service Contract for Chemical Treatment for Boiler Plant, Chiller Plant, and Potable Water Well

Physical Address View project details and contacts
City, State (County) Houston, TX 77030   (Harris County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The overall purpose is to provide chemical water treatment of boiler plant (water and steam), chillers (all condensers, all cooling towers water side), heating hot water, and potable water well to achieve specified results. Contractor shall provide all supplies and technical advisory services including reports for proper water chemistry treatment.
Details
Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents