Similar Projects
HVAC Upgrades at Middletown High School and Aquidneck Elementary School
Bidding
Middletown, RI 02842

Construction - B1320 HVAC Retrofit
Bidding
$100,000 to $250,000 est. value
Newport, RI 02841

District Wide Heating and Ventilation
Post-Bid
Westerly, RI 02891

HVAC Water Treatment Chemicals, Service and Testing
Term Contract
Post-Bid
Cranston, RI

Dust Collection System
Results
Providence, RI

HVAC Air Filters for T. F. Green Airport
Term Contract
Results
Warwick, RI 02886

RISE Prep Mayoral Academy HVAC Maintenance Services
Post-Bid
Woonsocket, RI 02895

Radiator Manufacture and Repair
Term Contract
Results
Warwick, RI 02886

Boiler Plant 7CC Condensate System Repairs
Post-Bid
$500,000 to $1,000,000 est. value
Newport, RI 02841

HVAC Upgrades
Results
$100,000 to $250,000 est. value
Newport, RI 02841

Air Handler Unit Repairs
Post-Bid
$25,000 to $100,000 est. value
Newport, RI 02841

Powers Building - HVAC Terminal Box Control Upgrade Phase II
Results
North Providence, RI 02908

North Kingstown High School Ac Improvements
Post-Bid
North Kingstown, RI 02852

Heating, Ventilating and Air Conditioning (HVAC) Maintenance, Boiler, Burner Repair Services
Results
North Kingstown, RI 02852

Ductless-Split Heating and Air Conditioning Systems
Post-Bid
Warwick, RI 02888

Reported 11/09/2019 12:00 AM
Project Title

Additional Cooling B-1351 NUWCDIVNPT

Physical Address View project details and contacts
City, State (County) Newport, RI 02841   (Newport County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall provide all materials, equipment, labor, and supervision to install added cooling in Building 1351, Room 115. • All work to be performed at Building 1351 Room 115 and adjacent spaces. • Work to be performed in accordance with the Drawings and this Statement of Work. • Customer to provide area for equipment and material storage. • Customer to provide access to area for workers and equipment. • All Work to be in accordance with OSHA and Army Corp of Engineers Safety Manual, EM-385-1-1 Current Edition Safety requirements. • Safety and Health Standards for Construction Industry (29 CFR PART 1929 2007). • NUWCDIVNPT Drawings 19-021A (9 sheets) and this Statement of Work, depict the work required on this particular project. • Contractor shall coordinate with the TPOC prior to commencement of work to ensure all scheduling and access issues have been addressed. Any questions will be directed to the TPOC and not through the customer where the project is being completed.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents