Similar Projects
Sparhawk Academy
New Construction - 8,000 SF
Design
Millis, MA

Maria Weston Chapman Middle School
Post-Bid
Less than $128,100,000 est. value
Weymouth, MA 02189

Roxbury Prep Washington Street Campus Alterations
Renovation
Post-Bid
$100,000 est. value
Boston, MA 02119

Wellesley Middle School Building Systems - Filed Sub Bids
Renovation
Results
$11,200,000 est. value
Wellesley, MA 02482

Sharon High School - Filed Sub Bids
New Construction - 240,204 SF
Results
$125,351,000 est. value
Sharon, MA 02067

Thayer Academy
New Construction, Renovation
Pending Verification
$64,755 est. value
Braintree, MA

South Middle School - General Bids
New Construction
Post-Bid
$72,331,417 est. value
Braintree, MA 02184

Michael Driscoll School Project - Filed Sub Bids
New Construction - 157,950 SF
Results
$92,800,000 est. value
Brookline, MA 02446

Interior Renovations to the Dental Assisting Suite at Madison Park Technical Vocational High School
Renovation
Post-Bid
Boston, MA

Needham High School Locker Room Reconfiguration
Results
Less than $50,000 est. value
Needham, MA

Owner's Project Manager
Renovation, Addition
Post-Bid
Franklin, MA 02038

Project Manager - Coakley Middle School
Results
$86,000,000 to $100,000,000 est. value
Norwood, MA

Disaster Recovery Services
Results

Project F Deferred Maintenance - Brookline High School Expansion - General Bids
Results
$3,211,928 est. value
Brookline, MA 02445

Project F Deferred Maintenance - Brookline High School Expansion - Filed Sub Bids
Results
$3,211,928 est. value
Brookline, MA 02445

Reported 07/27/2021 09:21 AM
Project Title

Security Vestibule - King Philip Middle School

Physical Address View project details and contacts
City, State (County) Norfolk, MA 02056   (Norfolk County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value $25,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing and installation of a new transaction window located on the inside of the existing vestibule, installation of aluminum framed storefront with tempered glass to match existing, installing new door hardware on existing interior entrance door, cutting and removing a section of wood capped half wall with-in Main Office and re-finishing ends. Existing electrical power, telephone and data lines are to be relocated and put into service as required. Provide new power and data lines at new transaction window.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents