Similar Projects
2020 West Alexander and Wilson Creek WWTP Improvements for the Headworks, Intermediate Pump Station, and Screw Pump Station
New Construction
Bidding
Greenwood, SC

Coachman Estates Pump Station Replacement
Renovation
Bidding
Greenville, SC

Central Plant Pump Station Motor Replacement
Post-Bid
Conway, SC 29526

Pump Station 7 Repairs
Post-Bid
$100,000 to $300,000 est. value
Hollywood, SC 29449

Dunwoody Oaks Pump Station Elimination
Results
Greenville, SC

South Greenville Enterprise Park Pump Station
Results
Greenville, SC 29673

Install Duplex Grinder Pump Station
New Construction
Bidding
Hollywood, SC

Lake Rabon Raw Water Pump Station Surge Tank Improvements
Post-Bid
$600,000 to $700,000 est. value
Laurens, SC

Construction of the Pump Station Upgrades
Results
Johnsonville, SC 29555

Pelham Primary Sludge Pump Station Improvements
Renovation
Bidding
Greenville, SC

Plant Control Pump Station - Pump Base Improvements
New Construction
Post-Bid
Charleston, SC

Brodie Pond Pump Station Improvements
Results
Batesburg-Leesville, SC

Buchanan Bridge Pump Station and Force Main
Renovation
Post-Bid
Less than $400,000 est. value
Chesterfield, SC

Pump Station #153 Control Panel Replacement
Results
Andrews, SC 29510

Travelers Rest Regional Pump Station
Renovation
Post-Bid
Greenville, SC

Last Updated 08/27/2021 10:57 AM
Project Title

Holiday Inn, Hilliard and Cantey Wastewater Pumping Station Renovations

Physical Address View project details and contacts
City, State (County) Santee, SC   (Orangeburg County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $406,381
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of Wastewater Pumping Station Improvements which include removing the existing power panels, pumps, piping, valves, fittings & related appurtenances; cleaning & protectively coating existing wet wells; installation of new power panels, pumps, piping, valves, fittings & related items; & new fence/gates at each pumping station.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents