Similar Projects
City Hall Offices & Plaza
New Construction
Design
Kenosha, WI 53140

District Attorney Office Rock County Court House
Renovation
Bidding
Janesville, WI 53545

Masonry Remediation at NWTC Greenbay Campus
Alteration
Bidding
Green Bay, WI

Construction Management (CM) Services Waukesha County Courthouse Project Step 2 - Renovate 1959 Courthouse
Renovation
Post-Bid
Waukesha, WI 53188

City Hall Renovation and Garage
New Construction, Renovation
Post-Bid
Arcadia, WI 54612

Child Support Agency Remodel
Renovation
Results
Less than $2,000,000 est. value
Madison, WI 53713

Masonry Repairs
Results
Less than $74,950 est. value
River Falls, WI 54022

Heating Plant Chimney Repairs
Alteration
Bidding
$100,000 est. value
Eau Claire, WI

Interior Courtroom at the Racine County Law Enforcement Center
Renovation
Post-Bid
Racine, WI 53400

Criminal Justice Office Remodel
Renovation
Results
Less than $25,000 est. value
Green Bay, WI 54301

Manitowoc County Courthouse Restroom Remodel
Renovation
Bidding
Manitowoc, WI 54220

Fire Station 10 Retaining Wall
Renovation
Post-Bid
Madison, WI 53704

Masonry Investigation and Assessment
Results
Less than $109,100 est. value
Green Bay, WI 54311

Menomonie Public Library Masonry Repair
Alteration
Bidding
Menomonie, WI 54751

Plainfield Town Hall
New Construction
Post-Bid
Plainfield, WI 54966

Last Updated 07/03/2021 03:40 AM
Project Title

North Stairwell Structural Wall Repair - Phase 2

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53233   (Milwaukee County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Capitol/Court House/City Hall, Masonry
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract 1: Bid Package 1 1. Water penetration in the stairway vestibule and stairwell has caused corrosion resulting in loss of section properties of the supporting angle. Though not visible, the anchors for this area are suspected for being corroded as well. Cracks in the wall adjacent to the vestibule door are likely due to shifting of the slab above the door and poor placement of reinforcement at the door jamb/header interface. The anchors supporting the mezzanine floor slab above the ground level men's toilet room are failing, likely due to a combination of inadequate embedment of anchors and minor shifting of the slab relative to the north wall. 2. Provide a new structural support for the MacArthur Square slab above stairway vestibule and stairwell. Replacing the existing deteriorated supporting angle as the means of primary structural support. 3. New waterproofing is required of the MacArthur Square slab to stop water penetration into the stairway vestibule and stairwell. 4. To provide a new means of support for the mezzanine floor slab above the ground level Men's Toilet Room.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents