Similar Projects
Flooring NF 323182 Exit Yellow (ERV
Post-Bid
Philadelphia, PA

Flooring Safety Applique Incom Css10268
Post-Bid
Less than $25,000 est. value
Philadelphia, PA

Carpeting
Post-Bid
Philadelphia, PA

Flooring Septa Spec S-1097-3 Rca Smooth
Post-Bid
Less than $25,000 est. value
Philadelphia, PA

Flooring Altro Transflor Mom2504 Altro
Post-Bid
$25,000 to $100,000 est. value
Philadelphia, PA 19107

Flooring Midnight TFM 27421 Center Aisle
Post-Bid
Philadelphia, PA 19107

Flooring Safety Applique Incom Css10269
Post-Bid
Less than $25,000 est. value
Philadelphia, PA

Flooring NF 323182 Exit Yellow ERV
Post-Bid
Philadelphia, PA 19107

Flooring Nova N47101-13 Covering
Post-Bid
Philadelphia, PA

Artigo Interior Rubber Flooring
Post-Bid
$25,000 to $100,000 est. value
Philadelphia, PA 19107

Flooring New Flyer 294317 Genome TFM
Post-Bid
Philadelphia, PA

Flooring Septa Spec S-1097-3 Rca Ribbed
Post-Bid
Less than $25,000 est. value
Philadelphia, PA 19107

Remove Old Carpet and Install New Carpet and Padding at Congress Hall
Post-Bid
Philadelphia, PA

Slip Resistant Floor Mats
Post-Bid
Philadelphia, PA 19102

Noraplan Valua 3,0 Mm Sheet
Post-Bid
Philadelphia, PA

Reported 10/29/2020 12:00 AM
Project Title

Carpet Replacement for 12th Street, Arch Street and 13th Street Concourses

Physical Address View project details and contacts
City, State (County) Philadelphia, PA   (Philadelphia County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Base Bid: Hall F Concourse 12th Street, Arch Street and 13th Street Concourses 1. Contractor to provide all labor and equipment required to perform the removal of the existing carpet at the 12th St., Arch St., & 13th St. Concourse (street level). 2. Contractor to provide all labor, misc. materials, and equipment required to perform the new carpet installation at the 12th St., Arch St., & 13th St. Concourse (street level) 3. Contractor will be responsible for all misc. materials, tools and equipment required for a complete installation. Contractor will be responsible to retrieve owner purchased carpet from designated storage area, located within the Convention Center facility. 4. Contractor will be responsible for the disposal of existing carpet that is removed and excess new carpet scraps. Contractor to provide their own dumpster. 5. Contractor to return new carpet not installed to owner’s designated storage area, located within the facility 6. Contractor to schedule work so not to disrupt the daily operations of the PA Convention Center.

Details

Division 09 - Finishes, Flooring, Carpeting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents