Similar Projects
2021 Water System Improvements
Infrastructure, Alteration
Results
$4,051,000 est. value
Bigfork, MT 59911

Lone Pine State Park Water System Improvements
Infrastructure
Bidding
$145,200 est. value
Kalispell, MT 59901

Spokane Avenue Water Main Replacement Project
Infrastructure
Post-Bid
Whitefish, MT 59937

VRF Piping Replacement
Infrastructure
Post-Bid
Helena, MT 59601

New Water and Sewer Main, Street Reconstruction
Infrastructure
Results
$619,326 est. value
East Helena, Helena, MT 59601

MLC Sewer and Water System Improvements
Infrastructure
Bidding
Helena, MT 59602

Cooper Street Alley Water Main Replacement Project
Infrastructure
Results
Missoula, MT

Stoddard or Cooley Water Main Replacement Project
Infrastructure
Results
Missoula, MT 59802

Beckwith Street Water Main Replacement
Infrastructure
Results
Missoula, MT 59801

Shakespeare Water Main Replacement Project
Infrastructure
Results
Missoula, MT 59802

Broadway Water Main Replacement Project
Infrastructure
Results
Missoula, MT 59804

Phase 6 Water System Improvements
Infrastructure
Post-Bid
Roundup, MT

Alkali Creek Water and Sewer Extension
Infrastructure
Bidding
Billings, MT

Last Updated 01/21/2022 04:26 PM
Project Title

Water System Improvements

Physical Address View project details and contacts
City, State (County) Billings, MT 59105   (Yellowstone County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of installing electric in-tank mixers and related electrical work in three potable water storage reservoirs owned by the County Water District of Billings Heights. They are the Hilltop reservoir (one mixer), Lanier reservoir (one mixer), and the Ox Bow reservoir (two mixers). The Hilltop and Lanier sites involve installation of the in-tank mixers and related electrical work to get the power from the Hilltop and Lanier pump stations to the in-tank mixers. In addition to the installation of the two in-tank mixers at the Ox Bow site, other Ox Bow site work includes constructing a 12’ by 20’ wood-framed building and concrete foundation; installation of a chlorine sampler/analyzer/chlorine dosing skid and sodium hypochlorite chemical storage totes; deluge-type combination safety shower and eye wash station; 119 gallon electric hot water heater; water pressure booster pump; interior and exterior lighting; exhaust fan and ducting; building heaters; 50’ steel light pole and concrete foundation; installation of a boulder pit and related underground drainage piping; related electrical and plumbing work inside the building; and related electrical and plumbing work on the Ox Bow reservoir.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents