Similar Projects
Maco Addition
Addition, Infrastructure - 7,800 SF
Conception
$4,200,000 CJ est. value
Shelby, NC 28150

Intersection Realignment
Infrastructure
Design
$1,000,000 CJ est. value
Shelby, NC 28150

Intersection Realignment
Infrastructure
Design
$1,000,000 CJ est. value
Shelby, NC 28150

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ D/B - US 74 / SR 1168 (Lattimore Road) intersection to an interchange, and replaces Bridge Nos. 220048 and 220049 on US 74 over Sandy Run Creek
Infrastructure
Bidding
$2,000,000 CJ est. value
Mooresboro, NC 28114

RFQ Contractor - Cleveland County Justice Center Phase 2 (BP02B Sitework & Utilities)
Infrastructure
Sub-Bidding
$4,600,000 CJ est. value
Shelby, NC 28150

Randolph Road Industrial Park Sewer
New Construction, Infrastructure
Post-Bid
Shelby, NC 28150

Cleveland Country Club New Pool and Pool House / Shelby
New Construction, Infrastructure - 3,918 SF
Post-Bid
$1,000,000 CJ est. value
Shelby, NC 28150

Brice Street Water Line Improvements Project
Infrastructure
Results
Kings Mountain, NC 28086

Water System Extension to Serve Paul Beam Road Area Near Cherryville
Infrastructure
Results
$997,018 CJ est. value
Cherryville, NC 28021

Cumberland Drive Stormwater Replacements
Infrastructure
Construction
$18,458 CJ est. value
Shelby, NC 28150

Cumberland Drive Stormwater Replacements
Infrastructure
Construction
$18,458 CJ est. value
Shelby, NC 28150

Cannon 35
New Construction, Infrastructure
Pending Verification
$275,000,000 CJ est. value
Kings Mountain, NC 28086

Patterson Homes
New Construction, Infrastructure
Pending Verification
$47,400,000 CJ est. value
Kings Mountain, NC 28086

Cannon 35
New Construction, Infrastructure
Design
$275,000,000 CJ est. value
Kings Mountain, NC 28086

Last Updated 12/13/2022 05:10 PM
Project Title

Construction Services for Project South

Physical Address View project details and contacts
City, State (County) Kings Mountain, NC 28086   (Cleveland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Request for Qualifications, Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

*As of December 2022, the owner has determined a prequalified list of design-build companies and designs are underway. Plans are expected to be completed in summer 2023. Although a firm timeline for construction as not been determined, construction is anticipated to begin prior to early fall 2023. The City of Kings Mountain is soliciting firms to participate in their intention to procure a Design-Builder to deliver design and construction services for Project South, which includes a wastewater treatment plant with a capacity of 4.0 Million Gallons Per Day (MGD), expandable to 6.0 MGD, gravity sewer collection system, lift stations, and force main. SOQs will not be publicly read, but a list of respondents will be available for public viewing by 10:00 AM on the fifth business day following receiving the SOQ's. Proposers must register their intent to submit by contacting the City of Kings Mountain Procurement Office by emailing Cathy Herring at cathyh@cityofkm.com. Prospective proposers must provide a name, phone number, and email address when they notify the Procurement Department of their intent. Additional information on the project will be given to the Potential proposers at that time. Questions from potential proposers shall be directed to Ms. Cathy Herring at cathyh@cityofkm.com until close of business on August 25, 2022 by emailing Ms. Cathy Herring at cathyh@cityofkm.com. Every reasonable attempt will be made to answer questions received in writing via an Addendum issued on July 28, 2022. Addenda will be issued to registered prospective proposers via email. Proposers are encouraged to contact the Owner to confirm the issuance of Addenda - the Owner will not be responsible for any proposer's failure to receive emailed Addenda. No oral interpretations or answers shall be binding upon the Owner or any proposer

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents