Similar Projects
Alligerville Fire House
Addition
Design
High Falls, NY 12440

NEQALS Ambulance Building
New Construction - 11,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Webster, NY 14580

South End Fire Station Grease Trap Installation
Bidding
NY

Carmel Fire Department Inc.– Addition/Renovation
Renovation, Addition - 27,532 SF
Bidding by Invitation
NY 10512

Construction of a Steel Building - New Slate Hill Fire House
New Construction - 12,800 SF
Post-Bid
Less than $2,500,000 est. value
Slate Hill, NY 10973

Waterford Consolidated Firehouse
Term Contract
Post-Bid
Waterford, NY

Additions and Alterations at Green Street Fire Station
Addition
Results
$4,000,000 to $4,500,000 est. value
Mount Kisco, NY 10549

Town of Cairo Ambulance Project
Results
Cairo, NY 12413

Renovations To The City Of Binghamton Police Station
Renovation
Construction
Binghamton, NY

Weaver Street Fire Station
Construction
Less than $1,300,000 est. value
Larchmont, NY 11791.

Z1DA--528A5-17-526 Fire Department Upgrades
Renovation
Design
$1,000,000 to $5,000,000 est. value
Canandaigua, NY 14424

Fire Station Renovation & Addition
Renovation, Addition
Post-Bid
$6,000,000 to $7,000,000 est. value
Purchase, NY 10577

Improvements to Fire Station 3
Results
Less than $750,000 est. value
Schenectady, NY 12301

Nichols Fire Station Addition and Renovations
Renovation, Addition, Term Contract
Construction
$3,000,000 to $4,000,000 est. value
Nichols, NY 13812

Improvements to Fire Stations 1, 2 and 4
Post-Bid
Schenectady, NY

Last Updated 10/22/2020 12:42 PM
Project Title

Fire Station and EMS Facility

Physical Address View project details and contacts
City, State (County) Rothschild, WI 54474 (Dunn, Marathon Counties)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method
Project Status Construction Commenced October 2020, Construction Completion Expected third quarter 2021
Bids Due View project details and contacts
Estimated Value $5,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Fire station and EMS facility with personnel living quarters. Separate Bid Packages Contract No 1 - Foundations & Building Concrete Contract No 2 - Masonry Contract No 3 - Structural Steel, Misc Metals & Building Shell Contract No 4 - Multi Scop Contract No 5 - Tiling Contract No 6 - Resilient, Carpet & Rubber Athletic Flooring Contract No 7 - Painting & Wall Covering Contract No 8 - Fire Suppression Contract No 9 - Plumbing Contract No 10 - HVAC Contract No 11 - Electrical Contract No 12 - Sheet Piling System Contract No 13 - Rammed Aggregate Piers Contract No 14 - Building Demolition Contract No 15 - Excavation, Earthwork, Site Improvements, Landscaping & Utilities

Details

Fire/Police Station, 1 Story Above Grade, 17,000 SF New Construction, Buildings.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents