Similar Projects
Pearl Street Apartments
New Construction, Infrastructure
Conception
$8,000,000 CJ est. value
Denver, CO 80203

Towneplace Suites and Fairfield Inn by Marriott / Denver
New Construction, Infrastructure
Design
$25,100,000 CJ est. value
Denver, CO 80204

Our Lady of the Lourdes School - Phase II
New Construction, Infrastructure - 21,000 SF
Design
$1,000,000 CJ est. value
Denver, CO 80210

2022 Citywide ADA Ramp and Concrete Repair Phase 4
Infrastructure
Bidding
$2,750,000 CJ est. value
Denver, CO 80202

2022 Citywide ADA Ramp and Concrete Repair Phase 4
Infrastructure
Bidding
$2,750,000 CJ est. value
Denver, CO 80202

Cleaning Maintenance And Snow Removal
Term Contract
Post-Bid
Denver, CO 80202

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

East 64th Avenue and Denali Street Infrastructure Project
Results
Denver, CO 80202

PKAA, Alpine Gulch Project
Results
$109,000 est. value
Denver, CO

Sheridan Station Mile High Development
New Construction - 138,566 SF
Construction
$10,000,000 est. value
Denver, CO 80214

Block 176
New Construction, Demolition - 767,123 SF
Construction
Denver, CO 80202

Humboldt Street Apartments
New Construction, Infrastructure - 5,300 SF
Pending Verification
$56,000,000 CJ est. value
Denver, CO 80218

Kabin 2.0 North and South Buildings
New Construction, Infrastructure - 119,123 SF
Pending Verification
$38,400,000 CJ est. value
Denver, CO 80216

York Street Apartments
Demolition, New Construction, Infrastructure
Design
$8,000,000 CJ est. value
Denver, CO 80210

2022 Citywide ADA Ramp and Concrete Repair Phase 3
Infrastructure
Bidding
$2,750,000 CJ est. value
Denver, CO 80202

Last Updated 09/20/2022 09:44 AM
Project Title

2022 Wastewater Infrastructure Program Support

Physical Address View project details and contacts
City, State (County) Denver, CO 80202   (Denver County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $3,300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Online Bidding: Available a. Participation - 7% MWBE The Engineers Estimate for total bid amount is between $3,000,000.00 - $3,300,000.00. The maximum contract amount is $2,000,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. A 2-year long contract designed to support the implementation of the Wastewater Infrastructure Improvement Projects and/or Programs. Work performed will include but is not limited to: replacement of sanitary and storm sewer infrastructure; Infrastructure Program systems support and/or development; cured-in-place lining for water, storm, and sanitary infrastructure; work in open channel waterways; environmental site investigation and/or early construction activities; negotiating early site access and agreements; structural rehabilitation of manholes, inlets, and other wastewater infrastructure, installation or stabilization of concrete flatwork, street infrastructure, or subgrades; promoting storm drainage in the City Right-of-way, City parks, or other City owned facilities and land; utility relocation and coordination; compliance with regulations including the American Disability Act; other work to satisfy City obligations under State, Federal, and Army Corp issued permits or other City agreements associated with Infrastructure Projects involving new construction, water quality, and drainage way improvements. This contract will be composed of multiple events and used on an as-needed basis. Contract term is two years and the maximum contract amount is $2,000,000.00 (contract amount is no guarantee of work). This contract may be awarded to multiple bidders. Deadline to Submit Questions: August 18, 2022 at 10:00 a.m., local time. Please submit questions to DOTI.Procurement@denvergov.org. 7% MWBE PREQUALIFICATION REQUIREMENTS: Each bidder must be prequalified in category 1E(4) PIPED SEWER at or above the $3,000,000.00 monetary level.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents