Last Updated | 06/08/2023 12:34 AM |
Project Title | LED Conversion |
Physical Address | View project details and contacts |
City, State (County) | Miami, FL 33132 (Miami-Dade County) |
Category(s) | Single Trades |
Sub-Category(s) | Service/Term Contracts |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $400,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Counties : Broward,Miami-dade, Turnpike Road Name: Led Conversion - Zone 1 Limits: Midpoint Project(s): 19077445227(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 14 The work specified in this contract consists of providing all labor, materials, equipment, and incidentals necessary to furnish and install LED luminaires on existing light poles and lighting systems in accordance with the manufacturer's recommendations including the removal and disposal of existing luminaires and all associated components at various locations on the Florida's Turnpike Enterprise System. No Pre-bid Conference Will Be Held for This Project. For Bids Over $150,000.00, the Standard Proposal Guaranty of 5% of the Bid Will Be Required, Unless Otherwise Stipulated in the Proposal Advertisement. A Proposal Guaranty of Not Less Than Five Percent (5%) of the Total Actual Bid in the Form of Either a Certified Check, Cashier's Check, Trust Company Treasurer's Check, Bank Draft of Any National or State Bank, or a Surety Proposal Guaranty Made Payable to the Florida Department of Transportation Must Be Received for Each Bid in Excess of $150,000.00 A 100% Payment and Performance Bond Will Be Required for All Projects. All Work is to Be Done in Accordance With the Plans, Special Provisions of the State of Florida Department of Transportation. Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Department's budget. FDOT - Call Order: 001 - LED Conversion |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |