Similar Projects
Municipal Water Well Improvements
Infrastructure
Post-Bid
$1,131,320 CJ est. value
Dayton, IA 50530

ICCC Biofuels Lab
New Construction, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Fort Dodge, IA 50501

N. 1 St Street Reconstruction
Infrastructure
Results
$2,349,925 CJ est. value
Fort Dodge, IA 50501

N. 1 St Street Reconstruction
Infrastructure
Results
$2,349,925 CJ est. value
Fort Dodge, IA 50501

Poplar Avenue Traveler's Center
New Construction, Infrastructure - 10,000 SF
Pending Verification
$6,000,000 CJ est. value
Fort Dodge, IA 50501

Poplar Avenue Traveler's Center
New Construction, Infrastructure - 10,000 SF
Pending Verification
$6,000,000 CJ est. value
Fort Dodge, IA 50501

Elanco Water Main Connection
Infrastructure
Post-Bid
$760,000 CJ est. value
Fort Dodge, IA 50501

2022 Asphalt Street Repair
Infrastructure
Results
Fort Dodge, IA

Roads - City of Fort Dodge
Infrastructure
Pending Verification
$141,450 CJ est. value
Fort Dodge, IA 50501

Georgia Pacific Water Main Connection
Infrastructure
Post-Bid
$334,662 CJ est. value
Fort Dodge, IA 50501

Granular Surfacing of Roadway
Infrastructure
Results

Corridor Plaza - Plat 2
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Fort Dodge, IA 50501

Construct Hangar "A" - Phase 1 (Unit 2-4)
Infrastructure, Renovation - 10,800 SF
Post-Bid
$550,000 CJ est. value
Fort Dodge, IA 50501

Triton Circle PCC Reconstruction
Infrastructure
Results
$441,200 est. value
Fort Dodge, IA 50501

AML Riverside
Addition, Demolition, Infrastructure
Pending Verification
$11,100,000 CJ est. value
Fort Dodge, IA 50501

Last Updated 08/17/2023 08:16 AM
Project Title

PCC Sidewalk/trail - P59 Trail

Physical Address View project details and contacts
City, State (County) Otho, IA 50569   (Webster County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $3,310,864 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Id : 94-C094-133 County : Webster Projects Included: NRT-C094(133)--9G-94 Route: P59 Trail Trail along P59 from 170th St in Webster County north to 2nd Ave SE in Badger Working Days : 120 Estimated Value : $3,500,000 - $4,000,000 Unless otherwise specified, a bidder shall submit a proposal as per Article 1102.09 of the Standard Specifications. Proposals received after the bid deadline will not be read. Proposals containing any reservations not provided for in the forms furnished will be rejected. The Iowa DOT reserves the right to waive technicalities and reject any or all bids. Unless otherwise specified, a bidder must submit a proposal guaranty/bid bond with each bid as per Article 1102.11 of the Standard Specifications. Failure to execute a contract and file an acceptable performance bond and certificate of insurance within 30 days of the approval date for awarding the contract will be just and sufficient cause for the denial of the award and forfeiture of the proposal guaranty. The Iowa DOT (or other approved contracting authority) hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Minimum wage rates for all federal-aid projects have been predetermined by the U.S. Secretary of Labor and are set forth in the specifications. However, this does not apply to projects off the federal-aid highway system. All federal-aid projects are subject to the Contract Work Hours Standards Act, as amended (title I of Pub. L. 87-581, Aug. 13, 1962, 75 Stat.357) and implementing regulations. IADOT - 104 - PCC Sidewalk/trail - P59 Trail *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents