Similar Projects
Otech Chiller Replacement Project
Alteration
Bidding
$200,000 est. value
Kissimmee, FL 34744

Internal Operations Center I Chiller Replacement
Alteration
Bidding
$81,500 est. value
Orlando, FL 32801

Replacement of Existing McQuay Chiller at Pensacola Downtown Public Library
Post-Bid
Pensacola, FL

Weatherization Assistance Program - HVAC and Mechanical
Post-Bid
Less than $14,796 est. value
Miami, FL 33169

Water Treatment for Cooling Towers and Closed Loop Systems
Term Contract
Results
Kissimmee, FL 34744

Fountain and Pond Management Services
Results
Less than $122,303 est. value
Jacksonville, FL

PBSO, Motor Pool - Chiller and Make-up Air Replacement
Term Contract
Bidding
West Palm Beach, FL 33406

Mechanical Insulation Services
Post-Bid
FL

Cooling Tower Water Treatment Services at the McIntosh Power Plant
Term Contract
Results
Lakeland, FL 33805

Trade Mechanical and Specialty Mechanical Contractors
Term Contract
Bidding
Lauderhill, FL

Pbc Convention Center - Coolers and Freezer Replacement
Post-Bid
West Palm Beach, FL 33411

Dyal Groundwater Filters #2 IMS Cap and Media Replacement
Results
Less than $233,928 est. value
Christmas, FL 32709

Chiller Replacement - Central Mechanical Building, CM 124
Alteration
Bidding
Lake Worth, FL 33461

Garage Elevator Repair State #43161 Halifax Health Daytona Beach Campus
Renovation
Post-Bid
Daytona Beach, FL 32116

Mechanical, Electrical and Plumbing Services Orangewood Elementary School AHU Renovation
Results
$3,500,000 to $4,500,000 est. value
Fort Myers, FL 33901

Last Updated 04/20/2022 12:32 PM
Project Title

Chiller Replacement

Physical Address View project details and contacts
City, State (County) Saint Petersburg, FL 33705   (Pinellas County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of furnishing of all labor/materials and performing all work necessary for the completion of the removal of two (2) 275-ton water cooled chillers, their associated cooling towers, associated condenser water piping, and associated chiller pumps. Work includes disconnecting DDC controls and associated electrical equipment. Contractor shall install two (2) new owner-furnished 275-ton air-cooled chillers on a new 6" deep concrete pad. Provide two (2) new pumps in place of existing and provide new insulated chilled water piping and valves to connect new chillers to existing chilled water piping. Exterior piping shall be fully covered with aluminum jacketing. Provide all necessary electrical equipment and DDC control components extending from existing facility systems

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents