Similar Projects
Construction Management Consulting Services Riverside Heavy Maintenance Building Project
Results
$500,000 to $1,000,000 est. value
Baltimore, MD 21202

Shuttle Bus Maintenance and Repair Services
Term Contract
Results
Towson, MD 21252

Barrel Bus Shelter Installation
Results
Baltimore, MD 21202

Bus Stop Upgrades for Americans with Disabilities Act (ADA) Compliance – Countywide 927-H (D)
Post-Bid
$1,000,000 to $2,500,000 est. value
Largo, MD 20774

Bus Shelter Repair, Maintenance and Installation
Results
Baltimore, MD 21201

Big Lots #5199
Renovation
Post-Bid
Baltimore, MD 21215

Demolition of Structures
Demolition - 2,000 SF
Post-Bid
Elkton, MD 21921

Bus Shelter Maintenance and Repair
Term Contract
Results
$1,000,000 to $2,500,000 est. value
Baltimore, MD 21202

US 301(Blue Star Memorial Highway) - Cecilton Truck Weigh Inspection Station
Results
$1,000,000 to $2,500,000 est. value
MD

Ride on Bus Stop Maintenance and Snow Removal Services
Results
Rockville, MD 20850

Queen Anne's County 911 Center Renovation
Renovation - 1,500 SF
Results
Centreville, MD 21617

MDOT MTA Riverside Heavy Maintenance Building Trade Packages
New Construction - 30,000 SF
Post-Bid
MD

Salt Storage Facility Demolition and General Construction
New Construction, Demolition - 8,000 SF
Results
California, MD 20619

Odenton MARC Station
Renovation
Conception
Odenton, MD

Reported 12/07/2019 12:00 AM
Project Title

Interior Renovation and Exterior Deck Construction of the East New Market (ENM) Historic Train Station

Physical Address View project details and contacts
City, State (County) East New Market, MD 21631   (Dorchester County)
Category(s) Transportation
Sub-Category(s) Misc. Structures
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The building is approximately 487 square feet in interior area. The interior renovations shall include new finishes, new single-user restroom, new electrical, new plumbing and new heating. Mechanical, electrical and plumbing shall be performed under a design-build contract between the general contractor and qualified sub contract. The Contractor shall provide all necessary labor, equipment, tools, materials and incidentals, and shall perform all operations required to completely finish all of the work

Details

Misc. Structures, 487 SF Renovation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents