Similar Projects
Osage Beach 2022 Pavement Maintenance Program - Rebid
Infrastructure
Design
$2,000,000 CJ est. value
Osage Beach, MO 65065

Arrowhead Centre Phase 2 - Assisted Living
New Construction, Infrastructure
Design
$385,000,000 CJ est. value
Osage Beach, MO 65065

Sands Gravity Sewer Main Replacement
Infrastructure
Bidding
$200,000 CJ est. value
Osage Beach, MO 65065

Water System Improvements - Water Supply Well
Infrastructure
Bidding
$970,000 CJ est. value
Camdenton, MO 65020

Camdenton Welcome Wall
Infrastructure
Post-Bid
$60,000 CJ est. value
Camdenton, MO 65020

Abandoned Well Plugging 2022
Infrastructure
Post-Bid
$6,840 CJ est. value
Osage Beach, MO 65065

Bridge Rehabilitation
Infrastructure
Results
$1,998,998 CJ est. value
Linn Creek, MO 65052

Pavement Improvements
Infrastructure
Results
$3,805,601 CJ est. value
Linn Creek, MO 65052

Widen Existing From 3 Lanes to 5 Lanes
Infrastructure
Construction
$5,024,000 CJ est. value
Linn Creek, MO 65052

Lake Regional Hospital Cardiac Institute and Cancer Center Expansion
Addition, Demolition, Renovation, Infrastructure - 40,000 SF
Pending Verification
$25,000,000 CJ est. value
Osage Beach, MO 65065

Hampton Manor of Lake Ozark
New Construction, Infrastructure - 66,000 SF
Pending Verification
$18,000,000 CJ est. value
Lake Ozark, MO 65049

Clint Ave Lift Station Access Road
Infrastructure
Bidding
$75,000 CJ est. value
Camdenton, MO 65020

Hatchery Road Box Culvert Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Pawhuska Township, MO 65065

Amy Lane Roadway Improvements & Case Road Driveway Improvements
Infrastructure
Results
$184,017 CJ est. value
Osage Beach, MO 65065

Marriott Hotel / Oasis at Lakeport
New Construction, Infrastructure - 76,000 SF
Pending Verification
$15,100,000 CJ est. value
Osage Beach, MO 65065

Last Updated 10/17/2023 10:06 AM
Project Title

Sanitary Sewer Service & Grinder Station Improvements

Physical Address View project details and contacts
City, State (County) Osage Beach, MO 65065   (Camden County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $12,114 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this contract includes installation of new grinder stations and sanitary sewer service on Runabout Drive, Aver Road, and Zebra Road. Improvements include new electrical equipment rack, new underground electrical service from transformer to electric meters and from electric meter to new transformer, installation of electrical panel and equipment, electric installation from panel to pumps, installation of new man hole, and new sewer connection into existing force main, manhole, and lift station. Work shall include any other incidental items and work described in the Project Manual, or reasonably inferable therefrom. OB23-026 LOR23-313 LOR23-314 LOR23-315 Bids must be submitted on the Bid Forms provided in the bound Bidding Documents Package and be accompanied by the bidder's certified check or bid bond in the amount of five percent (5%) of the total bid. A performance bond will be required of the successful bidder. The successful bidder will also be required to obtain a contractor's license and submit a certificate of insurance for workers' compensation. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. The City reserves the right to reject any and all bids, to waive informalities or irregularities, and to determine the lowest responsive and responsible bidder, and to award the contract on that basis. All Bidders must agree that such rejection shall be without liability on the part of the City for any damage or claim brought by any Bidder because of such rejection, nor shall the Bidder seek any recourse of any kind against the City because of such rejection. The filing of any Bid in response to this invitation shall constitute an agreement of the Bidder to these conditions. All disputes under this contract and any litigation resulting under this contract shall be filed, tried, remain and be ultimately resolved in the Circuit Court of Camden or Miller County on any appeal therefrom within the courts of the State of Missouri. The contractor hereby knowingly, intelligently and voluntarily agrees and waives any and all removal rights to federal court or the right to litigate the claim or any part thereof in courts of any other state for any reason.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents