Similar Projects
Hazard Mitigation and Stabilization for Sewer Lines
Bidding
$15,000,000 to $20,000,000 est. value
Ruidoso, NM 88345

Sleepy Farms Wastewater Collection System
Infrastructure
Bidding
$2,183,997 est. value
NM

On-site Residential Potable Water Cistern Systems and Wastewater Septic Disposal Systems
Post-Bid
Shiprock, NM 87420

Lea County Airport Water and Sewer Extension
Post-Bid
Hobbs, NM 88240

Wastewater Collection System Expansion
Results
Edgewood, NM

Mesquite-Brazito Wastewater System Improvements
Results
Less than $6,101,583 est. value
La Mesa, NM

Septage Tank Elimination and Municipal Sewer Connection
Infrastructure
Bidding
$425,000 est. value
Las Cruces, NM

Wastewater System Improvements
Post-Bid
Maxwell, NM

Village Sewer Line Improvement Project
Results
$6,874,096 est. value
Albuquerque, NM 87105

Construction of MS4 Outfalls
Infrastructure
Bidding
Rio Rancho, NM

On-Call Utility Repair
Post-Bid
Los Alamos, NM

Water and Wastewater Systems Maintenance and Repair Services
Results
Las Cruces, NM 88007

Grease Trap Pumping Services
Alteration
Bidding
Sunland Park, NM

On Call Utility Repair Services
Infrastructure
Post-Bid
Roswell, NM

Cleaning Sanitary Sewer Systems for DAC and CRRUA
Results
Las Cruces, NM 88007

Last Updated 02/17/2022 06:00 AM
Project Title

Hazard Mitigation and Stabilization for Sewer Lines

Physical Address View project details and contacts
City, State (County) Ruidoso, NM 88345   (Lincoln County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $15,000,000 to $20,000,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work for the existing sewer line includes installing new flood and structural encasement to protect the sewer line; lowering and encasing the sewer line; installing grouted boulder grade control structures, grouted boulder bank protection, scour walls, and dumped river rock boulder channels to protect the sewer line; and protecting the river bank and manholes with stabilization and armoring. New sewer line sections, manholes, and encasement will also be installed. Additionally, the project will also include stream bank restoration, reseeding and planting of disturbed areas after construction.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents