Similar Projects
Metal Registers, Grilles and Diffusers
Bidding
Phoenix, AZ 85016

Cooling Tower Water Treatment and Maintenance
Alteration
Bidding
Bullhead City, AZ

BCESD - HVAC Heat Pump Replacement Unit
Post-Bid
Bullhead City, AZ 86442

HVAC Maintenance and Repair Services
Post-Bid
Phoenix, AZ 85003

HVAC Support Maintenance for Nodes
Results
Fort Huachuca, AZ 85613

Air Handler Units (AHUs) Replacement
Results
Phoenix, AZ

HVAC Supplies and Equipment
Term Contract
Bidding
Less than $500,000 est. value
Mesa, AZ

DEMA SBAH Bldg L4535 Chiller Replacement (M20-0012) Single
Post-Bid
Marana, AZ

Western Region - HVAC Services
Results
Phoenix, AZ

Cooling Tower and Closed Loop Water System Treatment and Maintenance
Term Contract, Infrastructure
Bidding
Mesa, AZ

River Valley HVAC Replacements
Post-Bid
Bullhead City, AZ 86442

1700 West Washington Executive Tower AHUS Replacement
Results
Phoenix, AZ

DEMA Kitchen HVAC Makeup Air Units Replacement Building - 10 Single
Alteration
Bidding
Phoenix, AZ 85034

Chiller Replacement at Connolly Middle School
Post-Bid
Tempe, AZ 85282

Boiler Inspection Services
Results
Phoenix, AZ

Last Updated 06/10/2021 09:32 AM
Project Title

Yuma County Library District San Luis Branch Rooftop AC Unit Replacement

Physical Address View project details and contacts
City, State (County) San Luis, AZ 85349   (Yuma County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work is to disposal five (5) rooftop-mounted package AC units, and provide and install five (5) new rooftop AC units as follows: three (3) 15-ton, one (1) 12.5-ton, and one (1) 10-ton unit with economizer and power exhaust. Units are to either be heat pumps, or come equipped with electric heat strips. Contractor to provide/install curb adaptors as necessary. Convenience outlets and non-fused disconnects to be provided at each unit. Contractor to make all necessary electrical connections (460 volt/3 phase) to each unit. Contractor shall provide temporary thermostats, programmed to customer’s requirements, until building controls system (separate project) is completed.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents