Similar Projects
WWTP Consolidation Project Phase III
New Construction
Conception
$4,000,000 est. value
Pasadena, TX 77505

Dessau Wastewater Treatment Plant Capacity Expansion
Addition
Conception
$8,650,000 est. value
Austin, TX

New Multi-Use Solid Waste Department Facility
New Construction
Design
Houston, TX 77026

Wilbarger Creek Wastewater Treatment Facility
New Construction
Design
Pflugerville, TX

Port Arthur Main WWTP Improvements Project
Renovation
Bidding
$53,000,000 to $55,500,000 est. value
Port Arthur, TX 77642

Phase 4 Wastewater Treatment Plant Expansion (0.640 MGD)
Addition
Bidding
TX

Wastewater Treatment Plant Rotor Repair
Post-Bid
Mercedes, TX 78570

Acton MUD TWDB CWSRF WWTP No. 1 Improvements
Post-Bid
Less than $7,000,000 est. value
Granbury, TX

Salitrillo Wastewater Treatment Plant Progressive Design Build Upgrades
Results
Less than $25,000,000 est. value
San Antonio, TX 78204

Dissolve Air Floatation Unit and Support Replacement
Results
Less than $299,000 est. value
San Antonio, TX 78200

Northwest Wastewater Treatment Plant Office/Lab Construction
New Construction
Pending Verification
Copperas Cove, TX 76522

Doshier Wastewater Treatment Plant Expansion
Addition
Pending Verification
$18,000,000 est. value
Temple, TX 76501

South Austin Regional WWTP Trains A & B Improvements
Renovation
Conception
$78,230,000 est. value
Austin, TX 78799

TBWWTP Expansion, Phase II
Addition
Design
$28,820,000 est. value
Temple, TX 76502

Wastewater Treatment Plant Grit Removal Equipment Replacement and Site Electrical Improvements
Renovation
Bidding
$375,000 to $400,000 est. value
Bonham, TX

Last Updated 01/04/2022 07:38 AM
Project Title

Wastewater Treatment Plant Phase II Expansion

Physical Address View project details and contacts
City, State (County) TX   (Chambers County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,742,314
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Scope of Work includes fabrication and installation of a 240,000 gallon-per-day (gpd) Package Wastewater Treatment Plant (WWTP) for Phase II expansion to a 480,000 gpd wastewater treatment facility. The associated improvements include modifications and upgrades to the existing lift station, instrumentation and controls, electrical wiring and conduits replacement, structural repairs, paving and site improvements and shall be completed in place as described in the Project Manual and as shown in the Plans.

Details

Sewage Treatment Plant, Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents