Similar Projects
Sidewalk Repair Services
Infrastructure
Bidding
$5,800,000 est. value
FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Pipe Cleaning Drainage Systems
Results
Less than $65,000 est. value
FL

Sports Field Drainage Project, Tournament Sportsplex
Results
Tampa, FL 33619

Trench Drain System
Infrastructure
Post-Bid
Tampa, FL

Public Safety Operations Complex Pond Maintenance
Results
Less than $200,000 est. value
Tampa, FL 33619

Drainage Project of Lake Magdalene and Roosevelt Elementary Schools
Term Contract
Post-Bid
Tampa, FL 33612

2018 Kracker Avenue Restoration Project
Results
Less than $1,458,007 est. value
Gibsonton, FL 33534

Grading - Gibsonton Tract Mitigation Site
Infrastructure
Results
$3,159,800 est. value
FL

Drainage In Field Corridors, Tournament Sportsplex
Infrastructure
Results
Tampa, FL 33619

Grading - US 92 - Drainage Improvements
Infrastructure
Results
$3,693,800 est. value
Seffner, FL 33584

Milling and Resurfacing/Shoulder Widening/Drainage Improvements-SR 39 (Paul s Buchman Hwy)
Infrastructure
Results
$13,282,900 est. value
FL

SR 574 - Drainage Improvements
Infrastructure
Results
$248,200 est. value
FL

Outfall Maintenance Services for Mobility Department
Infrastructure
Results
Tampa, FL

Last Updated 03/10/2022 01:32 AM
Project Title

US 41/SR 45 Retaining Wall Replacement

Physical Address View project details and contacts
City, State (County) FL   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $371,200
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace The Existing Sea Wall South Of Sr 45 Along The East Bank Of The Little Manatee River, Regrading Approximately 345 Feet Of The Sr 45 Conveyance Ditch, And The Addition Of Erosion Protection To The Top And Bottom Of The Proposed Sea Wall (Concrete Ditch Pavement And Rip Rap Respectively) Alt Item Description Unit Quantity Section 0001 Roadway 101- 1- Mobilization (44948515201) Ls 1.000 102- 1- Maintenance Of Traffic (44948515201) Ls 1.000 104- 10- 3 Sediment Barrier Lf 314.000 104- 11- Floating Turbidity Barrier Lf 190.000 104- 18- Inlet Protection System Ea 1.000 107- 1- Litter Removal Ac 0.350 110- 1- 1 Clearing & Grubbing (44948515201) Ls 1.000 110- 4- 10 Removal Of Existing Concrete Sy 270.000 120- 1- Regular Excavation Cy 544.000 120- 6- Embankment Cy 8.000 400- 4- 8 Conc Class Iv, Bulkhead Cy 15.300 415- 1- 8 Reinforcing Steel- Bulkhead Lb 1,424.000 455-133- 3 Sheet Piling Steel, f&i Permanent Sf 2,004.000 524- 1- 29 Concrete Ditch Pavement, 4", Reinforced Sy 13.000 530- 3- 3 Riprap- Rubble, Bank And Shore Tn 15.000 530- 74- Bedding Stone Tn 13.000 570- 1- 2 Performance Turf, Sod Sy 450.000 999- 25- Initial Contingency Amount, Do Not Bid (44948515201) Ls 1.000

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents