Similar Projects
Gravity Sewer System Condition Assessment and Renewal and Replacement (Inflow/Infiltration - I/I) Excavated Point Repairs
Post-Bid
Hollywood, FL 33022

Civil Work Related to Taft Street Force Main Condition Assessment
Post-Bid
Hollywood, FL 33022

Sanitary Sewer/ Storm Drain Maintenance and Repair
Term Contract
Results
Lauderdale-by-the-Sea, FL 33308

Sanitary Sewer Manhole Rehabilitation, Annual Contract
Term Contract
Results
Pompano Beach, FL 33060

Infiltration and Inflow Removal Phase 2A Lateral Repairs
Post-Bid
Hallandale, FL 33009

Mecca Force Main Extension Project
Results
Fort Lauderdale, FL 33301

Lyons Park Stormwater and Wastewater Improvements
Post-Bid
Pompano Beach, FL

Gravity Sewer System Condition Assessment and Renewal and Replacement (Inflow/Infiltration - I/I) Cured-In-Place Pipe (CIPP Lining)
Results
Hollywood, FL 33022

Sanitary Sewer Lateral Connection and Lateral Pipe Product
Post-Bid
Plantation, FL

Septic Tank Elimination Program
Results
Less than $1,700,000 est. value
Fort Lauderdale, FL 33301

Maintenance, Repair and Install of Plumbing Systems and Lift Stations-Along Florida's Turnpike System
Results

Water and Sewer Emergency Repair Services
Term Contract
Results
Miramar, FL 33025

Northwest 13th Street Phase I Force Main Replacement - Design Build P12388
Results
Less than $2,450,000 est. value
Fort Lauderdale, FL 33301

Lift Station #48 Rehabilitation and Force Main Replacement
Results
Less than $300,000 est. value
Cooper City, FL 33329

Storm Sewer and Sewer Main Cleaning and Repairs
Term Contract
Results
Sunrise, FL 33351

Last Updated 01/13/2021 06:51 PM
Project Title

Replacement of Hallandale Beach Force Main and Large User Meter Lum-07

Physical Address View project details and contacts
City, State (County) Hollywood, FL 33022   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,171,973
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of a force main replacement and large user meter (LUM-07) site improvements project: replacement of the existing Large User Meter LUM-07, air release valve, electrical components, vaults and site, also abandonment of approximately 4,900 LF of existing FM and construction of approximately 3,800 linear feet of 16-inch PVC force main via open cut and 500 linear feet of 20-inch HDPE force main via HDD from LUM-07, located on the south side of Pembroke Rd. and S. 18th Ct., to an existing 30-inch diameter force main connection located at the intersection of S. 15th Ave. and the alley between Rodman St. and Funston St.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents