Similar Projects
2023 Elgin Township Resurfacing Contract
Infrastructure
Bidding
$101,160 CJ est. value
Elgin, IL 60120

RFQ Contractor - Hernandez-West Park-ICR
Renovation
Bidding
$1,500,000 CJ est. value
Chicago, IL 60632

UIC Dumpster Pads
Renovation, Alteration
Post-Bid
Chicago, IL 60607

Weir Concrete Repairs
Alteration
Post-Bid
IL

IVHM FY22 Concrete
Alteration
Results
Manteno, IL 60950

Downtown Plaza
Renovation, Infrastructure
Results
Carbondale, IL

Construction of Arenzville Rural Water Cooperative Phase III
Infrastructure
Construction
$1,519,702 CJ est. value
Arenzville, IL 62611

Construction of Arenzville Rural Water Cooperative Phase III
Infrastructure
Construction
$1,519,702 CJ est. value
Arenzville, IL 62611

Forest Park 2023 Alley Improvements
Infrastructure
Bidding
$2,000,000 CJ est. value
Forest Park, IL 60130

Advanced Technology Precast Concrete Hollow Core Planks
Alteration
Post-Bid
Grayslake, IL 60030

Pool Concrete Removal
Demolition, Alteration
Results
Mount Prospect, IL

Concrete Installation and Repair
Term Contract
Post-Bid
Algonquin, IL

Booth Library Main Stairs
Alteration
Results
Charleston, IL 61920

Engineering Services for Curb and Gutter Installation
Infrastructure
Post-Bid
Greenville, IL 62246

Pin & Link Assembly Expansion Joint Retrofits 4
Alteration
Results
Chicago, IL

Last Updated 03/18/2023 06:06 AM
Project Title

Splashpad Concrete Expansion project

Physical Address View project details and contacts
City, State (County) Godfrey, IL 62035   (Madison County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $20,388 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description The scope of work for the project is shown on the attached sketch and involves the excavation, fill, and grading of the existing dirt surrounding the splashpad to provide for a 4 inch thick compacted aggregate base and a 4 inch thick concrete pad with thickened edge of the dimensions shown.Following the removal of forms, backfill shall be placed and the surrounding area will be graded to match the adjacent ground followed by restoration with fertilizer, seed, and straw.The contractor should be aware that the splashpad features are supplied by underground PVC pipes of various sizes located between the north edge of the existing concrete and the control box. Equipment shall not be driven over the pipes in order to prevent any damage. Completing the work in this manner shall be the responsibility of the contractor and he or she should adjust the proposal accordingly. Project Schedule Work for this project is expected to begin as soon as possible and is estimated to require no more than five (5) working days to complete. The contractor will be issued a notice to proceed following the submission of a Certificate of Insurance showing the Village of Godfrey as an additional insured.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents