Similar Projects
Water Valve Replacements Phase 4
Post-Bid
Tarentum, PA 15084

Ductile Iron Pipe
Term Contract
Post-Bid
Erie, PA 16507

Water Street Waterline Replacement Project
Results
Linesville, PA

Sr 208 Additional Force Main
Results
Mercer, PA

Polyethylene Pipe
Post-Bid
Greensburg, PA 15601

Backwater Valve Maintenance Contract
Results
Pittsburgh, PA

Copper Pipe
Post-Bid
New Stanton, PA 15672

Sanitary and Storm Water Cipp Project
Results
Lock Haven, PA 17745

Judicial Center - Water Intrusion Repairs
Post-Bid
$1,000,000 to $2,000,000 est. value
Harrisburg, PA 17120

Steam Tunnel Replacement
Results
Indiana, PA

2020 Small Diameter Water Main Replacement Contract A
Post-Bid
Pittsburgh, PA 15222

Construction of the Glendale Valley Municipal Authority's Church Hill Water Interconnection Bore
Results
Flinton, PA

2020 Small Diameter Water Main Replacement Contract B
Post-Bid
PA

Waterline Replacement Project
Results
Clymer, PA 15728

Jefferson Waterline Replacement
Post-Bid
PA

Last Updated 05/14/2020 03:27 PM
Project Title

Service Maintenance Contract for the Water Distribution System - General Construction

Physical Address View project details and contacts
City, State (County) Reading, PA 19606   (Berks County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $450,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project generally consists of water distribution system repairs requiring excavation, removal, installation, repair and replacement of water distribution components, erosion and sedimentation control, trench dewatering, traffic control and site restoration work. The work to be performed under this contract is located throughout the service area of Mount Penn Borough Municipal Authority (MPBMA) and will be performed on an as needed basis at the directive of the Owner. The owner reserves the right to increase or decrease the work without effect to the unit prices bid. The Contractor is also required to perform emergency repairs to the water distribution system on an as-needed basis for a period of one (1) year.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents