Similar Projects
Community Center Replacement Dumpster Enclosure
Infrastructure
Design
$170,000 CJ est. value
Fenton, MI 48430

West Winds Condominium (Stony Brook Phase III)
New Construction, Infrastructure
Design
$51,000,000 CJ est. value
Fenton, MI 48430

N. Long Lake Road 8" Sanitary Forcemain Extension
Infrastructure
Bidding
$300,000 CJ est. value
Fenton, MI 48430

2022 Deerfield Township Hall Renovation
Infrastructure, Renovation
Bidding
$2,000,000 CJ est. value
Linden, MI 48451

Sewer Rehabilitation - Coldwater Road Site
Infrastructure
Post-Bid
Flint, MI 48505

Sewer II System Improvements, Pump Stations
Renovation
Post-Bid
Flint, MI

Dort Pump Station Rehabilitation
Results
Flint, MI

Armstrong Middle School Site Improvements
Results
Flint, MI 48506

Lahring Road and US-23 Multi Residential Development
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Fenton, MI 48430

Dowdall Elementary - 2022 Bond - Kearsley Community Schools
Addition, Alteration
Design
$1,000,000 est. value
Flint, MI 48506

Bridge Rehabilitation Including Structural Steel Repairs, Heat Straightening and Zone Painting on Hill Road Over US-23
Infrastructure
Bidding
$547,000 CJ est. value
Flint, MI 48532

Environmental Abatement & Disposal of Asbestos and Hazardous Materials & Demolition and Disposal of Residential and Commercial Structures in Genesee County
Term Contract, Demolition, Infrastructure
Post-Bid
$110,000 CJ est. value
Flint, MI 48502

Clio Pump Station Rehabilitation
Results
Less than $100,000 est. value
Clio, MI 48420

Athletic Lighting
Infrastructure
Design
$200,000 CJ est. value
Flint, MI 48502

Dye Road Curb and Gutter Repair
Infrastructure
Bidding
$200,000 CJ est. value
Flint, MI 48532

Last Updated 08/17/2022 10:05 AM
Project Title

Second Well at Well 3

Physical Address View project details and contacts
City, State (County) Otisville, MI 48463   (Genesee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The referenced project is a federally funded activity authorized under the Coronavirus State and Local Fiscal Recovery Fund (SLFRF), 31 CFR Part 35, as amended; All successful bidders must comply with federal labor standards, including the Davis-Bacon Act and the Copeland Anti-Kickback legislation; federal equal opportunity requirements. Minority/Women/Handicapped business owned enterprises (MBE/WBE/HBE) and Section 3 business concerns seeking bid opportunities under this Project Notice are encouraged to respond. Project Description: Determining best location for the second well, testing, installing, connecting second well to the distribution system, and conduct all required samples and testing required by EGLE. The right is reserved by the Village of Otisville to accept and bid, to reject any or all bids, and to waive any irregularities in any bid, in the interest of the Village of Otisville.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents