Similar Projects
Hawes Crossing - Master Plan
New Construction
Conception
Mesa, AZ 85212

Mesa Mixed-Use Development
New Construction
Conception
$28,000,000 est. value
Mesa, AZ 85203

Sleep Inn/Mainstay Suites
New Construction - 42,267 SF
Design
Mesa, AZ 85212

The Blue
New Construction - 681,000 SF
Design
$146,000,000 est. value
Phoenix, AZ 85004

WoodSprings Suites Chandler & Tolleson
New Construction
Sub-Bidding
Tolleson, AZ 85353

Hyatt Wingate by Wyndham
New Construction - 70,586 SF
Sub-Bidding
$5,000,000 to $10,000,000 CJ est. value
Mesa, AZ 85209

Phase 4 - Maintenance and Pool House
Post-Bid
Gila Bend, AZ 85337

Marriott Springhill Suites at Surprise Center
New Construction - 64,147 SF
Post-Bid
$5,000,000 est. value
Surprise, AZ 85374

Develop Hotel, Resort, Complimentary Retail, Conference Center Space
Results
Gilbert, AZ 85296

Stadium Point at P83 - Master Developer
Results
Peoria, AZ

Ritz-Carlton Community
New Construction - 2,500 SF
Construction
$1,500,000,000 est. value
Paradise Valley, AZ 85253

Best Western Plus /Executive Residency
New Construction - 56,394 SF
Construction
$7,556,796 est. value
Phoenix, AZ 85085

Astra Phoenix
New Construction - 2,005,000 SF
Pending Verification
$480,000,000 est. value
Phoenix, AZ 85003

The Global Ambassador
New Construction, Build-Out - 90,000 SF
Pending Verification
Phoenix, AZ 85018

Stadium Point at P83
New Construction - 1,000,000 SF
Conception
Peoria, AZ 85382

Last Updated 05/03/2022 04:25 PM
Project Title

Caesars Republic Scottsdale

Physical Address View project details and contacts
City, State (County) Scottsdale, AZ 85251   (Maricopa County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Hotel/Motel, Swimming Pool(s)
Contracting Method
Project Status Construction Commenced February 2020, Construction Completion Expected first quarter 2024
Bids Due View project details and contacts
Estimated Value $60,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Hotel/Motel, 11 Stories Above Grade, 246,913 SF New Construction 266 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Walk-In Freezers, Foodservice Shelving, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Bar Equipment, Service Line Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Commercial Dishwashers.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents