Similar Projects
Scheduled and Emergency Drainage Structure and Pipe Cleaning at Various Locations
Infrastructure
Bidding
$89,225 est. value

Furnish Water, Sewer, and Drain Materials
Term Contract
Bidding
Agawam, MA

Jackson Street Sewer Separation Project
Post-Bid
$7,100,000 est. value
Holyoke, MA 01040

Bluebird Sewer Pipeline Project Contract No. 2
Post-Bid
Less than $874,000 est. value
Chicopee, MA

Birnie Avenue / Piper Road Area Sewer Expansion Project
Results
$5,754,881 est. value
West Springfield, MA 01089

Reconstruction of Manhole No. 50
Results
Holyoke, MA 01040

Permanent Wastewater Flow Monitoring Project
Infrastructure
Bidding
$350,000 est. value
East Longmeadow, MA

Adjustment, Repair and /or Reconstruction of 29 Sewer Manholes
Post-Bid
Palmer, MA

Memorial Avenue Sewer Lateral Locating and Televising
Results
West Springfield, MA

Structure Adjustment, Repair and Construction, Frames, Covers and Grates
Infrastructure
Bidding
Palmer, MA

Tower Road, Motyka Street, Grimard Street Sanitary Sewer Expansion Project
Post-Bid
Ludlow, MA

Sewer Pipe Replacement and Rehabilitation
Results
$1,588,170 est. value
Springfield, MA 01101

Construction of the Main Street and Broad Street Sewer Rehabilitation
Results
$356,451 est. value
Westfield, MA 01085

2021 Manhole Sealing Project
Results
$64,000 est. value
East Longmeadow, MA

Ohio Avenue Sewer Main Repair
Results
$527,310 est. value
West Springfield, MA

Last Updated 05/25/2021 09:38 AM
Project Title

Converse Street Sewer Improvement

Physical Address View project details and contacts
City, State (County) Longmeadow, MA   (Hampden County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of the removal and replacement of the sanitary sewer main, sewer manholes, sanitary service connections, and trench patch on Converse Street. Project completion shall be 30 calendar days from the date of the Notice to Proceed. Construction shall proceed no sooner than June 28, 2021. All bids for this project are subj ct to the provisions of Massachusetts General Laws Chapter 30, Section 39M as amended.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents