Similar Projects
Utilities - US 69
Infrastructure
Design
$782,135 CJ est. value
McAlester, OK 74501

Grade, Drain, Bridge and Surface - SH 63
Infrastructure
Design
$3,050,508 CJ est. value
Arch, OK 74501

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

McAlester Duplexes and Affordable Rental Home
New Construction, Infrastructure
Post-Bid
$14,000,000 CJ est. value
McAlester, OK 74501

Resurface (Asphalt) SH-31
Infrastructure
Results
$1,614,159 est. value
OK

4A Steven Taylor Industrial Park System Improvements
Infrastructure
Results
$647,700 CJ est. value
McAlester, OK 74501

O'Reilly Auto Parts (MA2) #6669 / McAlester
New Construction, Infrastructure
Construction
$400,000 CJ est. value
McAlester, OK 74501

Choctaw Nation McAlester Clinic Expansion
Addition, Renovation, Infrastructure - 51,000 SF
Construction
$70,000,000 CJ est. value
McAlester, OK 74501

Reconstruct - No Added Lanes
Infrastructure
Design
$4,300,000 CJ est. value
McAlester, OK 74501

Asphalt Road on Tanglewood Drive
Infrastructure
Post-Bid
$400,000 CJ est. value
McAlester, OK 74501

DWSRF Project 5 School Waterline Improvements
Infrastructure
Results
$554,298 CJ est. value
McAlester, OK 74501

Right of Way - US069
Infrastructure
Design
$3,000,000 CJ est. value
McAlester, OK 74501

A New Cafeteria for Quinton Public Schools
New Construction, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Quinton, OK 74561

30 Foot X 60 Foot Concrete Pad for a Future Building
Infrastructure
Results
$25,010 CJ est. value
Krebs, OK 74501

Pavement Rehabilitation - US069
Infrastructure
Design
$12,000,000 CJ est. value
McAlester, OK 74501

Last Updated 09/10/2023 01:31 PM
Project Title

Pavement Rehabilitation, Dowel Bar Retrofit and Diamond Grind Indian Nation Turnpike

Physical Address View project details and contacts
City, State (County) McAlester, OK 74501   (Pittsburg County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: Pittsburg Calendar Days: 240 Days Pavement Rehabilitation, Dowel Bar Retrofit and Diamond Grind Indian Nation Turnpike: From Mp 52, Extend North to Mp 70 Near Mcalester. Project Length = 17.58 Miles Unless otherwise specified in the proposal, all bids must be submitted with a proposal guaranty equal to 5 % of the bid total. OKDOT - 080 - Pavement Rehabilitation, Dowel Bar Retrofit and Diamond Grind - Indian Nation Tpke Question Deadline 09/01/2023 at 10:30 AM CT Although the Notice to Proceed for this project will be issued in the normal manner, the actual work shall be delayed until March 4, 2024, to allow for coordination with an adjacent project located in the area

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents